• General briefings
  • Ethernet Services
  • Ultrafast access
  • Superfast access
  • Wholesale Line Rental
  • Local Loop Unbundling
  • Ethernet into Data Centres
  • Physical Infrastructure Access
  • Dark Fibre
  • SOTAP
  • Archived briefings

Briefings

To be included or removed from the distribution list for CP briefing notifications use the ‘Follow this page’ button.

GEN035/20

05-06-2020
eChat changes: implementation of EiVA and changing eChat platform

DATA003/20

04-06-2020
Openreach fibre availability at Virtus London 5, Prologis Park West London

DATA004/20

04-06-2020
Openreach fibre availability at China Mobile International Data Centre Slough

WLR006/19

04-06-2020
Notice of scheduled outages of billing system for Q1 2019

WLR005/20

01-06-2020
Notice of outage of billing system for June 2020/21

NGA2014/20

01-06-2020
Fibre on Demand (FoD) price changes and introduction of new speeds

ETH023/20

01-06-2020
EAD 10Gbps 12 Month Connection Charges Price Change

LLU003/20

28-05-2020
Revised space licence fees for LLU and Access Locate

ETH022/20

28-05-2020
Excess Construction Charge (ECC) Fixed Fee Update

DATA002/20

27-05-2020
Openreach fibre availability at Interextion Data Centre London

WLR004/20

22-05-2020
Notice of outage of billing system for JUNE 2020/21

ETH021/20

22-05-2020
Update: Waiver for EAD 100Mb and 1Gb special offer

GEN034/20

22-05-2020
Planned Engineering Work and Incident Notifications

NGA2013/20

20-05-2020
Bringing forward provision appointments on behalf of CPs

GEN033/20

19-05-2020
Updated EMP Plus release dates

NGA015/20

15-05-2020
SOGEA New Line Provide with installation at Premises discounted rate during COVID-19 period

ETH020/20

11-05-2020
EAD special offer relating to deferred service for EAD 100Mb and 1Gb products

GEN030/20

05-05-2020
Bringing forward provision appointments on behalf of CPs

GEN031/20

05-05-2020
Notice of GBBU User Guide version update

ETH019/20

04-05-2020
Ethernet Access Direct Reach and Mainlink investigation

ETH018/20

30-04-2020
Openreach TDM Access End of Service Notification

GEN028/20

29-04-2020
Emergency Welfare Echat Trial

GEN029/20

29-04-2020
Openreach ebXML/B2B Gateway Signing Certificate Renewal

NGA2012/20

28-04-2020
Notice of FTTP Transition Discount Removal

GEN027/20

28-04-2020
New Openreach Portal workshops

GEN026/20

23-04-2020
WLR Withdrawal Industry Working Group: A More Focused Session on Vulnerable End Customers

ETH017/20

22-04-2020
Re-imagining Ethernet Provision (REP) revised design: response extension

PIA010/20

21-04-2020
PIA Ancillary Items Product Launches and Withdrawals

WLR003/20

21-04-2020
Notice of scheduled outage of billing system for May 2020

GEN024/20

21-04-2020
Supporting UK Small and Medium Enterprises (SMEs)

GEN025/20

21-04-2020
Supporting UK Small and Medium Enterprises (SMEs)

ETH015/20

15-04-2020
Improved CP Perception Survey

ETH016/20

15-04-2020
Process to avoid EMP EAD, EBD and DFX order cancellation due to customer delays

GEN023/20

14-04-2020
Supporting UK Small and Medium Enterprises (SMEs)

GEN022/20

09-04-2020
Openreach ebXML/B2B Gateway Server Certificate Renewal

GEN021/20

08-04-2020
Escalations Trial Change to Acceptance Criteria

PIA007/20

07-04-2020
Launch of Simplified Underground PIA Lead-In

PIA006/20

06-04-2020
Physical Infrastructure Access (PIA). Publication of Updated Engineering Principle CP08

LLU002/20

02-04-2020
LLU and Access Locate 2020/21 energy price review

GEN020/20

02-04-2020
PIA Ancillary Items and SLU Joint Box Break-In Price Changes

GEN019/20

01-04-2020
Escalations Trial Change to Acceptance Criteria

ETH014/20

31-03-2020
Excess Construction Charges Price Changes

NGA2010/20

25-03-2020
GEA-FTTP two-tiered cancellation charge

PIA005/20

25-03-2020
Publication of the updated Physical Infrastructure Access (PIA) Terms and Conditions

NGA2009/20

24-03-2020
GEA-FTTP for Business Trial

PIA004/20

24-03-2020
Publication of Updated Engineering Principles and Adoption of Overlay

GEN018/20

23-03-2020
WLR Withdrawal Industry Working Group: A More Focused Session on Forced Migrations

GEN017/20

20-03-2020
Changes to our offshore call centre availability on Sunday 22 March

NGA013/20

19-03-2020
Appointment Changes Update

ETH013/20

18-03-2020
Re-imagining Ethernet Provision (REP) revised design

NGA012/20

16-03-2020
GEA-FTTP and SOGEA 0.5/0.5 Mbps launch date and price update

ETH012/20

13-03-2020
CRF (Customer Requirement Form)

GEN016/20

12-03-2020
Version withdrawal of XML services as part of EMP Release R4400

GEN015/20

11-03-2020
Change to WLR withdrawal working group meeting planned for 16 March 2020

ETH011/20

10-03-2020
WES/WEES/BES (up to and including 1Gbps) changes to the service level agreement

WLR002/20

05-03-2020
Notice of scheduled outages of billing system for Q2 2020/21

NGA2008/20

04-03-2020
Openreach consultation response on GEA-FTTP for Business

ETH010/20

04-03-2020
Ethernet Access Direct (EAD) 1Gbps connection special offer in Gigabit Drop Zones

NGA2007/20

03-03-2020
Gfast full launch & pricing

NGA010/20

03-03-2020
SOGEA launch briefing, pricing update and contract update

NGA2006/20

02-03-2020
GEA-FTTP Working Line Takeover

LLU001/20

02-03-2020
SLU tie cable cease price changes

GEN014/20

28-02-2020
TRC and AVC prices for 2020/21

NGA2005/20

27-02-2020
Openreach to launch new GEA-FTTP speed tiers

GEN013/20

27-02-2020
GEA Cablelink cease price change

GEN012/20

26-02-2020
Openreach SDEDS Gateway Migration to Enterprise cloud sites.

WLR001/20

25-02-2020
Calling and Network Features price changes

GEN011/20

25-02-2020
Launch pricing for two SOGEA/SOGFast Site Visit Reasons (SVR)

NGA2003/20

24-02-2020
GEA-FTTP for Business trial

GEN010/20

24-02-2020
Invitation to the WLR industry consultation working group

GEN009/20

21-02-2020
Update on EiVA integration into View My Job and Portal eChat

NGA009/20

21-02-2020
GEA-FTTP and SOGEA 0.5/0.5 Mbps launch date and price notification

GEN008/20

13-02-2020
Special Fault Investigation - price and product changes

ETH008/20

12-02-2020
Improvements to the Optical Services Customer Requirement Form

GEN007/20

07-02-2020
Service Delivery Transformation Update

GEN006/20

03-02-2020
Openreach ebXML/B2B gateway - new enterprise cloud sites and decommissioning of old sites

NGA007/20

31-01-2020
Special offer to support the Salisbury and Mildenhall trials

GEN005/20

29-01-2020
More Focussed Appointments price changes

ETH005/20

28-01-2020
Portal user guide now available for Street Access 1Gbps

ETH006/20

28-01-2020
Order Entry Improvements update

NGA2002/20

27-01-2020
New FTTP locations in market towns, villages and rural areas

GEN004/20

27-01-2020
EiVA integration into View My Job and Portal eChat Links

GEN002/20

24-01-2020
Dark Fibre X product contract change notification

GEN003/20

24-01-2020
Openreach ebXML/B2B Gateway Server Certificate Renewal

NGA004/20

24-01-2020
Dynamic Line Management - ReTransmission on day 0

NGA005/20

24-01-2020
Dynamic Line Management - 5 retrain DLM trial

NGA003/20

23-01-2020
SOGEA New Line Provide with Managed Install Special Offer

NGA2001/20

17-01-2020
Launch of eChat Service for Fibre to the Premises (FTTP)

PIA001/20

17-01-2020
Physical Infrastructure Access (PIA). Publication of Updated Engineering Principle CP09

GEN001/20

16-01-2020
B2B gateway - Introduction of new enterprise cloud sites

DATA001/20

07-01-2020
Openreach fibre availability at Iron Mountain Data Centre Slough

NGA001/20

06-01-2020
Special offer to support the Salisbury and Mildenhall trials

NGA2032/19

31-12-2019
Update: Modem Compliance Testing (MCT) change of formwize addresses

GEN112/19

23-12-2019
Service Delivery Transformation Update

ETH091/19

23-12-2019
Launch of Street Access 1Gbps

NGA035/19

23-12-2019
SOGEA New Line Provide with Managed Install Special Offer

NGA034/19

23-12-2019
SOGEA contract change and launch update

GEN111/19

20-12-2019
Update: Contact channels in Gurugram affected by the Delhi protests

GEN110/19

19-12-2019
Contact channels in Gurugram affected by the Delhi protests

NGA2031/19

16-12-2019
Modem Compliance Testing (MCT) Change of Formwize Address

NGA033/19

17-12-2019
Modem Compliance Testing (MCT) Change of Formwize Address

GEN108/19

16-12-2019
Changes to Gfast escalation routes

GEN106/19

16-12-2019
Changes to Line Isolations Units escalation route

GEN109/19

16-12-2019
Changes to Named engineer escalation route

GEN107/19

16-12-2019
Changes to High Impact Provision Of Service (HIPOS) escalation route

WLR013/19

16-12-2019
Urgent essential maintenance outage of the billing system

GEN103/19

09-12-2019
Notification of Product Stop Sells for the Salisbury and Mildenhall Trials

GEN104/19

09-12-2019
Notification of Salisbury and Mildenhall trials start date

GEN105/19

09-12-2019
Invitation to attend an event on the future of WLR and related products

GEN102/19

06-12-2019
Impacts to our Customer Service team

NGA2030/19

03-12-2019
CORRECTION: GEA-FTTP Only offer

GEN100/19

27-11-2019
EMP system test which will change the prefix to order/fault report references in EMP

GEN101/19

27-11-2019
Openreach ebXML/B2B gateway - Introduction of new enterprise cloud sites

GEN099/19

25-11-2019
UPDATE: Agile appointing Proof of Concept

GEN097/19

22-11-2019
Introduction of a new region for Dark Fibre X (DFX)

GEN098/19

22-11-2019
Full Launch of Dark Fibre X product

ETH087/19

22-11-2019
EAD Migrations from eCo to EMP

GEN096/19

20-11-2019
EiVA to eChat hand-off technical trial

NGA03219

20-11-2019
GEA-FTTC - improved processes to fix network routing delays

GEN095/19

15-11-2019
Agile appointing Proof of Concept

NGA2028/19

14-11-2019
Invitation to ForViva meeting on 17 December 2019

GEN094/19

14-11-2019
Notification of intention to withdraw all Broadband Boost Products.

ETH084/19

12-11-2019
Order Entry Improvements Update

WLR010/19

12-11-2019
Improvements to the WLR PRS Barring service

WLR009/19

11-11-2019
Notice of scheduled outages of billing system for Q1 2020

WLR011/19

11-11-2019
WLR Calls Pence Per Call billing reimbursements

NGA2027/19

07-11-2019
Refresh of the FFIB Standard Terms and Conditions

ETH083/19

06-11-2019
Project services order desk trial - Ethernet Access Direct (EAD)

GEN093/19

05-11-2019
Openreach ebXML/B2B gateway - Introduction of new enterprise cloud sites

NGA2026/19

04-11-2019
GEA-FTTP Localised Marketing offer

NGA031/19

02-11-2019
Change to Special Offer on GEA-FTTC VDSL Managed Install

GEN092/19

01-11-2019
Revised energy usage per kWh pricing for Local Loop Unbundling (LLU) and Access Locate products

GEN091/19

31-10-2019
Named Engineer Process Reminder

GEN090/19

31-10-2019
ECC Pricing Update, effective from 2 December 2019 and 31 January 2020

GEN089/19

30-10-2019
Review of Local Loop Unbundling (LLU) Ancillaries Prices

GEN088/19

30-10-2019
Openreach Webservice/XML Gateway. Decommissioning of old stack Infrastructure

ETH081/19

30-10-2019
Ethernet Access Portfolio Rationalisation (Phase 2)

NGA2025/19

24-10-2019
FTTP on Demand price list format update

GEN085/19

24-10-2019
EMP system test which will change the prefix to order/fault report references in EMP

GEN086/19

24-10-2019
Version withdrawal of XML services as part of EMP Release R4300

ETH079/19

24-10-2019
From EMP R4250 Excess Construction Charge values will be to two decimal places

GEN084/19

23-10-2019
Update on our CSM site in Pune India affected by the elections

GEN083/19

17-10-2019
CSM site in Pune India will be affected by the elections

NGA2023/19

16-10-2019
Launch pricing for two Ultrafast Site Visit Reasons (SVR)

GEN081/19

15-10-2019
Changes to SOGEA escalation routes

GEN080/19

15-10-2019
Changes to Application Service Desk escalation routes

GEN082/19

15-10-2019
Changes to Premium Business Helpdesk escalation routes

NGA2022/19

10-10-2019
Economic benefits of full fibre broadband in the UK plus a blueprint for faster build

ETH076/19

10-10-2019
Single Interface for Optical product escalations

NGA2021/19

06-10-2019
Launch of village trials to boost rural full fibre

GEN079/19

02-10-2019
Site Specific Risk Assessment Method Statement (SSRAMS) New Process Trial

ETH074/19

02-10-2019
Deployment changes to "improvements to the communication of charges in Openreach KCIs"

NGA2020/19

01-10-2019
29 new Fibre First FTTP locations announced

ETH072/19

30-09-2019
Openreach BES, WES and WEES 2500 and 10000 End of Service Notification

GEN078/19

27-09-2019
Invitation to the WLR withdrawal industry consultation working group

GEN077/19

26-09-2019
Changes to ISDN2 and ISDN30 escalation routes

NGA029/19

26-09-2019
Extension to Dynamic Line Management (DLM) Policy Modification Special offer

GEN076/19

25-09-2019
Introduction of two new regions for Dark Fibre X (DFX)

NGA2019/19

22-09-2019
GEA-FTTP order tracking tool - Launch of the HUD

GEN075/19

20-09-2019
Issue with a change scheduled to be deployed in EMP R4150 on 21 September 2019

GEN073/19

19-09-2019
Changes to bridge case target SLAs

GEN074/19

19-09-2019
Updated Confidential SOR Process

ETH068/19

18-09-2019
Improvements to the communication of charges in Openreach KCIs

NGA2018/19

17-09-2019
GEA-FTTP 115/20, 220/30, 550/75 & 1000/115 Mbps launch date and price notification

NGA028/19

16-09-2019
Update: Temporal DLM Trial

GEN071/19

13-09-2019
Notice of change to wabilling@bt.com email account

GEN072/19

13-09-2019
FTTP Exchange/Single Order Exchange Upgrade trials consultation response

ETH066/19

13-09-2019
Correction to Optical Spectrum Access price list notes

NGA2017/19

12-09-2019
FTTP Bandwidth Modification special offer

NGA2016/19

10-09-2019
Openreach Gfast deployment plans

NGA2015/19

09-09-2019
Point of Sale Best Practice Guide For GEA-FTTP

GEN070/19

06-09-2019
Openreach event:Future of WLR and related products-LONDON-17Sep2019,CHANGE OF VENUE

GEN069/19

30-08-2019
Revised energy usage per kWh pricing for Local Loop Unbundling (LLU) and Access Locate products

WLR008/19

30-08-2019
Notice of scheduled outages of billing system for Q4 2019

NGA2014/19

28-08-2019
Consultation response extension GEA-FTTP for Business

NGA026/19

21-08-2019
SOGEA and SOGFast Early Market Deployment Launch Pricing

GEN067/19

19-08-2019
The Electronic Communications Code(Conditions and Restrictions)Regulations 2003

GEN068/19

19-08-2019
Premium Business Helpdesk Proforma Change

GEN065/19

15-08-2019
Non-Standard Lines Price Changes

GEN066/19

15-08-2019
Engineering and Service Solutions Price Changes

GEN064/19

08-08-2019
Network delivery under The Electronic Communications Code Regulations

GEN062/19

08-08-2019
Soft Launch of Dark Fibre X product (including prices)

GEN063/19

08-08-2019
Notice of GBBU User Guide version update

ETH059/19

08-08-2019
Deployment changes to Telephone Validation for Ethernet Orders

GEN059/19

07-08-2019
Weather conditions in India

GEN057/19

02-08-2019
SOR8492: CP personnel working beyond the NTE - in-life process launch

GEN058/19

02-08-2019
SOR8492: CP personnel working beyond the NTE - in-life process launch

ETH057/19

02-08-2019
Ethernet Access Direct(EAD) 100Mbps and 1000Mbps Redistributed Pricing offer

NGA2013/19

02-08-2019
36 new Fibre First FTTP locations announced

PIA007/19

01-08-2019
Publication of the Updated Reference Offer reflecting PIMR changes

ETH054/19

31-07-2019
Telephone Validation for Ethernet Orders

ETH056/19

31-07-2019
Launch of .kmz route maps on Optical services

NGA2012/19

29-07-2019
Gfast Early Market Deployment Launch (EMDL) Pricing Available Now

ETH053/19

26-07-2019
Change to the URL for accessing legacy Clarity updates

GEN056/19

25-07-2019
Consultation response extension FTTP Exchange/Single Order Exchange Upgrade trials

ETH052/19

25-07-2019
EAD Migrations from eCo to EMP

ETH051/19

23-07-2019
Order Entry Improvements Update

ETH049/19

22-07-2019
Full withdrawal of legacy high bandwidth services

ETH050/19

22-07-2019
Withdrawal of OSA Service Cabinet option

NGA2010/19

21-07-2019
GEA-FTTP for Business Consultation Document

NGA2011/19

21-07-2019
FTTP and FVA List Price Changes

NGA021/19

19-07-2019
Launch of eChat Service for Single Order (SOGEA, SOGFast)

GEN054/19

18-07-2019
Bulk Modification Price Change

GEN055/19

18-07-2019
Project Services Optional Services

NGA019/19

12-07-2019
Power Spectral Density Reshaping - REVISED DATE

NGA020/19

12-07-2019
GEA-FTTC provision and repair - escalating network routing delays

NGA018/19

11-07-2019
Power Spectral Density Reshaping

NGA017/19

11-07-2019
Dynamic Line Management (DLM) Policy Modification Special offer

GEN053/19

04-07-2019
Invitation to attend an event on the future of WLR and related products

ETH045/19

04-07-2019
Ethernet Access Direct (EAD) Cancellation Special Offer

WLR004/19

03-07-2019
Notice of scheduled outages of billing system for Q3 2019

GEN052/19

02-07-2019
SLU Portfolio price changes

GEN051/19

01-07-2019
Notice of change to wabilling@bt.com email account

WLR007/19

01-07-2019
WLR and ISDN Ancillaries price changes

NGA2009/19

30-06-2019
Gfast Early Market Deployment Launch Pricing

NGA2008/19

27-06-2019
Change to Gfast minimum selling rule

GEN050/19

27-06-2019
Fibre Cable (ECC) Price Change

NGA016/19

27-06-2019
GEA Ancillaries Pricing Updates and FIRS withdrawal

GEN049/19

25-06-2019
WLR withdrawal programme - subscribe to our newsletter

GEN049/19

25-06-2019
WLR withdrawal programme - subscribe to our newsletter

NGA2007/19

20-06-2019
Notification of Fibre Voice Access stop sell

ETH040/19

20-06-2019
Ethernet Access Portfolio Rationalisation

ETH039/19

18-06-2019
Refresh and expansion of on-net list

GEN048/19

17-06-2019
Consultation response on upgrading UK's digital infrastructure with GEA-FTTP

GEN047/19

17-06-2019
Consultation on FTTP Exchange Upgrade and Single Order Exchange Upgrade trials

ETH038/19

17-06-2019
Street Access 1Gbps Access Product Trial Phase 2

NGA2006/19

16-06-2019
Inside Out Engineering Concept Trial

ETH037/19

13-06-2019
Quick Win proof of concept extension

NGA2005/19

12-06-2019
Notice of change to the SNNs used in GEA-FTTP provide orders

ETH036/19

12-06-2019
Point of No Amend (PONA) trial update

NGA015/19

11-06-2019
GEA-FTTC provision and repair-escalating network routing delays

GEN045/19

06-06-2019
Invitation to join a knowledge call on the WLR withdrawal programme

GEN044/19

06-06-2019
UPDATE:Invitation to the WLR/SOTAP industry consultation working group

NGA014/19

06-06-2019
Higher ReTransmission Levels Trial

ETH033/19

03-06-2019
New 7 year EAD 10Gbps & OSA FC pricing (plus replacement 5 year OSA FC price)

ETH032/19

31-05-2019
Ethernet Access Direct (EAD) 1000Mbps Connection Special offer

NGA2004/19

22-05-2019
CP proof of concept phase for our GEA-FTTP order tracking tool

GEN042/19

22-05-2019
SDEDS Server Certificate Renewal

GEN040/19

20-05-2019
Invitation to the WLR / SOTAP industry consultation working group

GEN041/19

20-05-2019
Electrical compliance requirements for LLU and Access Locate Points of Presence

ETH029/19

20-05-2019
Quick Win process on the Equivalence Management Platform (EMP)

ETH028/19

17-05-2019
EAD 100Mbps-1000Mbps remote upgrade and EAD 1000 Base-T status

GEN039/19

16-05-2019
Password protection of attachments

NGA013/19

16-05-2019
Simulated SOGEA day two field test solution proof of concept on FTTC services

GEN038/19

14-05-2019
Openreach to update design of end customer website

GEN037/19

13-05-2019
EiVA chatbot availability in production

GEN036/19

08-05-2019
Customer Service Management (CSM) teams

NGA010/19

08-05-2019
Tactical DLM Reset Solution continuation

NGA009/19

02-05-2019
GEA-FTTC provision - exchange only (EO) lines

GEN035/19

01-05-2019
Response extension for Upgrading the UK's digital infrastructure consultation

ETH025/19

29-04-2019
KCI Performance measure

ETH024/19

26-04-2019
Update on the Proactive Overlay Payments Scheme

WLR003/19

26-04-2019
Bringing forward the billing of WLR products from calendar day 2 to calendar day 1 each month

ETH022/19

23-04-2019
Ethernet Access Direct Quick Win process on the Equivalence Management Platform

GEN033/19

18-04-2019
Notification of the deployment of a change which was scheduled in EMP R4000 on 23 March 2019

ETH021/19

17-04-2019
EAD 1Gbps remote upgrade pricing (from either EAD 10Mbps or 100Mbps)

ETH019/19

17-04-2019
Street Access 1Gbps Access Product Trial Extension

ETH020/19

17-04-2019
Ethernet Access Portfolio Rationalisation

GEN032/19

16-04-2019
Notification of amendments to changes scheduled to be deployed in EMP R4000+

GEN031/19

15-04-2019
CSM site in Pune India will be affected by the national elections

NGA008/19

15-04-2019
End of tactical DLM Reset Solution

GEN030/19

01-04-2019
Publication of a revised dimensioning tool for the Flexible Comingling Product (FCP)

PIA004/19

01-04-2019
Physical Infrastructure Access (PIA) - Duct & Pole Access Map Tool Enhancements

ETH014/19

28-03-2019
WES/WEES/BES (up to and includin 1Gbps) withdrawal of service

NGA2003/19

26-03-2019
GEA-FTTP 330/50 Mbps special offer extension

GEN029/19

26-03-2019
Invitation to the WLR / SOTAP industry consultation working group

GEN028/19

25-03-2019
Revised space licence fees for LLU and Access Locate

NGA007/19

23-03-2019
FVA in combination with Generic Ethernet Access up to 55Mbps/10Mbps

GEN027/19

22-03-2019
Notification of amendments to a change scheduled to be deployed in EMP R4000 on 23 March 2019

GEN026/19

21-03-2019
Openreach consultation on an exchange-based approach to upgrading the UK's digital infrastructure

GEN025/19

20-03-2019
Notification of amendments to changes scheduled to be deployed in EMP R4000 on 23 March 2019

GEN024/19

20-03-2019
Migration of legacy SDEDS to new Openreach Infrastructure

ETH012/19

19-03-2019
Technical update for OSA FSP3000 Filter Connect

ETH011/19

19-03-2019
Launch of new sites for Ethernet Backhaul Direct

NGA2002/19

14-03-2019
10 Gigabit GEA Cablelink selected exchange special offer

NGA006/19

15-03-2019
Retaining error protection trial

NGA005/19

15-03-2019
Increase of DLM speed caps trial

WLR002/19

14-03-2019
Notice of scheduled outages of billing system for Q2 2019

GEN023/19

13-03-2019
Notification of an amendment to a change scheduled to be deployed in EMP R4000 on 23 March 2019

GEN021/19

08-03-2019
Industry consultation on the UKs digital infrastructure

GEN022/19

08-03-2019
Removing visit save on simultaneous provide of WLR3 / LLU MPF and GEA-FTTC

NGA004/19

08-03-2019
L2C Launch of the adjusted Standard DLM stability policy

GEN020/19

05-03-2019
Automatic Compensation - changes to support our customers

GEN019/19

04-03-2019
Change to SIM2 orders matching period

GEN017/19

04-03-2019
e-Chat for CP Complaints - Trial

GEN018/19

04-03-2019
Changes to Openreach Portal Contact Us Page

PIA003/19

04-03-2019
Physical Infrastructure Access (PIA) Publication of Final Reference Offer

ETH010/19

01-03-2019
Ethernet Access Direct (EAD) 1000Mbps Flexzone Connection Pricing offer

GEN016/19

28-02-2019
TRC and SFI prices for 2019/20

ETH009/19

21-02-2019
Re-imagining Ethernet Provision - implementation

GEN014/19

20-02-2019
Revised energy usage per kWh pricing for Local Loop Unbundling (LLU) and Access Locate products

GEN015/19

19-02-2019
Pilot and roll-out of capability for Openreach IP authentication on GEA-FTTC services

GEN013/19

19-02-2019
EiVA Chatbot Proof of Concept

GEN012/19

15-02-2019
Notice of GBBU User Guide version update

ETH008/19

15-02-2019
Re-imagining Ethernet Provision - CP feedback

NGA003/19

15-02-2019
L2C Launch of the adjusted Standard DLM stability policy

GEN010/19

08-02-2019
CP contact routes for DSO & ECRT teams

GEN011/19

08-02-2019
Emergency Welfare Process Development Review

NGA002/19

06-02-2019
Launch of a new fault reporting process for GEA Cablelink

NGA2001/19

31-01-2019
GEA-FTTP selected exchange trial offer

GEN009/19

31-01-2019
Rollback of Change Deployed within EMP R3950 on 19 January 2019

GEN008/19

30-01-2019
Invitation to the WLR / SOTAP industry consultation working group

ETH006/19

30-01-2019
Update on the Proactive Overlay Payments Scheme

GEN007/19

24-01-2019
Notification of Contracts - data protection changes

GEN006/19

24-01-2019
Improving the way new requests are raised to the Openreach Data Integrity Team

ETH005/19

24-01-2019
OSA Filter Connect for Belfast City LFFN bid

PIA002/19

21-01-2019
Physical Infrastructure Access (PIA) - Duct & Pole Access Map Tool Enhancements

GEN005/19

18-01-2019
Statement of Requirements System Changes

ETH004/19

18-01-2019
Point of No Amend (PONA) trial update

GEN004/19

17-01-2019
EMP Release - raising manual Emergency Welfare faults

ETH002/19

11-01-2019
Fibre Infrastructure Pre-build trial.

GEN003/19

10-01-2019
Statement of Requirements System Changes

GEN002/19

09-01-2019
CP personnel working beyond the Network Termination Equipment (NTE) Proof of Concept extension

GEN001/19

07-01-2019
Reminder to register for the next WLR withdrawal industry consultation sub working group session

PIA001/19

07-01-2019
PIA update - Network adjustment proof of concept

GEN106/20

Openreach Presents: The UK Digital Upgrade

Archived briefings

For archived briefings please click on the link above