Feature | Applicable to following bandwidth variants | Note | Operative date | Until | Connection £ Exc VAT |
---|---|---|---|---|---|
Engineer Installation with Openreach Modem | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/07/2009 | 31/08/2011 | 75.00 |
Engineer Installation with Openreach Modem | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/09/2011 | 31/03/2013 | 80.00 |
Engineer Installation with Openreach Modem | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/04/2013 | 31/03/2016 | 92.00 |
Engineer Installation with Openreach Modem | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/04/2016 | withdrawn | |
Managed Engineer Install with Openreach Modem | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1 and 5 | 01/04/2013 | 31/03/2016 | 92.00 |
Managed Engineer Install with Openreach Modem | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1 and 5 | 01/04/2016 | withdrawn | |
Managed Engineer Install with CP Device | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1 and 6 | 31/12/2013 | 05/07/2021 | 99.00 |
Managed Engineer Install with CP Device | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1 and 6 | 06/07/2021 | 31/03/2022 | 99.70 |
Managed Engineer Install with CP Device | Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1 and 6 | 01/04/2022 | 31/03/2023 | 95.00 |
Managed Engineer Install with CP Device | Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1 and 6 | 01/04/2023 | 31/03/2024 | 105.50 |
Managed Engineer Install with CP Device | Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1 and 6 | 01/04/2024 | 31/03/2025 | 110.40 |
Managed Engineer Install with CP Device | Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1 and 6 | 01/04/2025 | 23/04/2025 | 113.00 |
Managed Engineer Install with CP Device | Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1, 6 and 15 | 24/04/2025 | 113.00 | |
Standard Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 30/07/2019 | 05/07/2021 | 79.00 |
Standard Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 06/07/2021 | 31/03/2022 | 79.60 |
Standard Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 01/04/2022 | 31/03/2023 | 82.90 |
Standard Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 01/04/2023 | 31/03/2024 | 92.10 |
Standard Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 01/04/2024 | 31/03/2025 | 96.30 |
Standard Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 01/04/2025 | 98.60 | |
Premium Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 30/07/2019 | 05/07/2021 | 99.00 |
Premium Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 06/07/2021 | 31/03/2022 | 99.70 |
Premium Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 01/04/2022 | 31/03/2023 | 103.00 |
Premium Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 01/04/2023 | 31/03/2024 | 112.20 |
Premium Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 01/04/2024 | 31/03/2025 | 116.40 |
Premium Managed Engineer Install with CP Device | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Notes 1 and 6 | 01/04/2025 | 128.60 | |
PCP Only Install | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 31/12/2013 | 31/03/2018 | 49.00 |
PCP Only Install | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/04/2018 | 31/03/2019 | 46.96 |
PCP Only Install | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/04/2019 | 31/03/2020 | 45.92 |
PCP Only Install | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/04/2020 | 30/06/2021 | 46.84 |
PCP Only Install | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/07/2021 | 31/03/2022 | 47.27 |
PCP Only Install | Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/04/2022 | 31/03/2023 | 49.14 |
PCP Only Install | Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/04/2023 | 31/03/2024 | 54.59 |
PCP Only Install | Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/04/2024 | 31/03/2025 | 57.11 |
PCP Only Install | Up to 40Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Note 1 | 01/04/2025 | 23/04/2025 | 58.43 |
PCP Only Install | Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | Notes 1 and 15 | 24/04/2025 | 58.43 | |
Start of Stopped Line (Trial price) | All bandwidth variants | 23/09/2014 | 03/05/2016 | 32.52 | |
Start of Stopped Line | All bandwidth variants | 04/05/2016 | 30/06/2017 | 32.52 | |
Start of Stopped Line | All bandwidth variants | 01/07/2017 | 31/03/2018 | 11.00 | |
Start of Stopped Line | All bandwidth variants | 01/04/2018 | 31/03/2019 | 4.63 | |
Start of Stopped Line | All bandwidth variants | 01/04/2019 | 31/03/2020 | 2.99 | |
Start of Stopped Line | All bandwidth variants | 01/04/2020 | 30/06/2021 | 3.06 | |
Start of Stopped Line | All bandwidth variants | 01/07/2021 | 31/03/2022 | 3.08 | |
Start of Stopped Line | All bandwidth variants | 01/04/2022 | 31/03/2023 | 3.20 | |
Start of Stopped Line | All bandwidth variants | 01/04/2023 | 31/03/2024 | 3.55 | |
Start of Stopped Line | All bandwidth variants | 01/04/2024 | 31/03/2025 | 3.71 | |
Start of Stopped Line | All bandwidth variants | 01/04/2025 | 3.81 |
Feature | Applicable to following bandwidth variants | Note | Operative date | Until | Connection £ Exc VAT |
---|---|---|---|---|---|
Non-Tech modify visit to Premises | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | 01/10/2020 | 05/07/2021 | 79.00 | |
Non-Tech modify visit to Premises | Up to 18Mbit/s / 2Mbit/s, Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | 06/07/2021 | 31/03/2022 | 79.70 | |
Non-Tech modify visit to Premises | Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | 01/04/2022 | 31/03/2023 | 82.20 | |
Non-Tech modify visit to Premises | Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | 01/04/2023 | 31/03/2024 | 89.10 | |
Non-Tech modify visit to Premises | Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | 01/04/2024 | 31/03/2025 | 92.30 | |
Non-Tech modify visit to Premises | Up to 40Mbit/s / 10Mbit/s, Up to 55Mbit/s / 10Mbit/s, Up to 80Mbit/s / 20Mbit/s | 01/04/2025 | 94.50 | ||
Non-Tech modify visit to Premises [Standard] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Note 1, 3 | 01/10/2020 | 05/07/2021 | 59.00 |
Non-Tech modify visit to Premises [Standard] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Note 1, 3 | 06/07/2021 | 31/03/2022 | 59.60 |
Non-Tech modify visit to Premises [Standard] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Note 1, 3 | 01/04/2022 | 31/03/2023 | 62.10 |
Non-Tech modify visit to Premises [Standard] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Note 1, 3 | 01/04/2023 | 31/03/2024 | 69.00 |
Non-Tech modify visit to Premises [Standard] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Note 1, 3 | 01/04/2024 | 31/03/2025 | 72.20 |
Non-Tech modify visit to Premises [Standard] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | Note 1, 3 | 01/04/2025 | 73.90 | |
Non-Tech modify visit to Premises [Premium] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | 01/10/2020 | 05/07/2021 | 79.00 | |
Non-Tech modify visit to Premises [Premium] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | 06/07/2021 | 31/03/2022 | 79.70 | |
Non-Tech modify visit to Premises [Premium] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | 01/04/2022 | 31/03/2023 | 82.20 | |
Non-Tech modify visit to Premises [Premium] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | 01/04/2023 | 31/03/2024 | 89.10 | |
Non-Tech modify visit to Premises [Premium] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | 01/04/2024 | 31/03/2025 | 92.30 | |
Non-Tech modify visit to Premises [Premium] | Up to 160Mbit/s / 30Mbit/s, Up to 330Mbit/s / 50Mbit/s | 01/04/2025 | 103.90 |
Feature | Note | Operative date | Until | Special Offers Available | Connection £ Exc VAT |
---|---|---|---|---|---|
CP-CP GEA Migration - same product/premises | 01/07/2009 | 30/07/2014 | 50.00 | ||
CP-CP GEA Migration - same product/premises | 31/07/2014 | 31/03/2018 | 11.00 | ||
CP-CP GEA Migration - same product/premises | 01/04/2018 | 31/03/2019 | 4.63 | ||
CP-CP GEA Migration - same product/premises | 01/04/2019 | 31/03/2020 | 2.99 | ||
CP-CP GEA Migration - same product/premises | 01/04/2020 | 30/06/2021 | 3.06 | ||
CP-CP GEA Migration - same product/premises | 01/07/2021 | 31/03/2022 | 3.08 | ||
CP-CP GEA Migration - same product/premises | 01/04/2022 | 31/03/2023 | 3.20 | ||
CP-CP GEA Migration - same product/premises | 01/04/2023 | 31/03/2024 | 3.55 | ||
CP-CP GEA Migration - same product/premises | 01/04/2024 | 31/03/2025 | 3.71 | ||
CP-CP GEA Migration - same product/premises | 01/04/2025 | 3.81 | |||
Uplift charge from Up to 40Mbit/s / 2Mbit/s product to Up to 40Mbit/s / increased Upstream beyond 2Mbit/s up to 10Mbit/s | 01/07/2009 | 29/09/2010 | 10.00 | ||
Uplift charge from Up to 40Mbit/s / 2Mbit/s product to Up to 40Mbit/s / increased Upstream beyond 2Mbit/s up to 10Mbit/s | 30/09/2010 | 17/10/2013 | 10.00 | ||
Uplift charge from Up to 40Mbit/s /10Mbit/s product to Up to 40Mbit/s / increased Upstream beyond 10Mbit/s up to 15Mbit/s | 30/09/2010 | 31/08/2011 | 10.00 | ||
Uplift charge from Up to 40Mbit/s downstream and up to 2Mbit/s product to Up to 80Mbit/s downstream and up to 20Mbit/s upstream | 10/04/2012 | 17/10/2013 | Special Offer available -see Section 8.4 | 10.00 | |
Uplift charge from Up to 40Mbit/s downstream and up to 10Mbit/s product to Up to 80Mbit/s downstream and up to 20Mbit/s upstream | 10/04/2012 | 17/10/2013 | Special Offer available -see Section 8.4 | 10.00 | |
Bandwidth Modify Charge | 18/10/2013 | 19/06/2014 | Special Offer available -see Section 8.4 | 10.00 | |
Bandwidth Modify Charge | 20/06/2014 | 31/03/2018 | Special Offer available -see Section 8.4 | 11.25 | |
Bandwidth Modify Charge | 01/04/2018 | 31/03/2019 | 7.26 | ||
Bandwidth Modify Charge | 01/04/2019 | 31/03/2020 | 5.82 | ||
Bandwidth Modify Charge | 01/04/2020 | 30/06/2021 | 5.58 | ||
Bandwidth Modify Charge | 01/07/2021 | 31/03/2022 | 5.64 | ||
Bandwidth Modify Charge | 01/04/2022 | 31/03/2023 | 5.86 | ||
Bandwidth Modify Charge | 01/04/2023 | 31/03/2024 | 6.51 | ||
Bandwidth Modify Charge | 01/04/2024 | 31/03/2025 | 6.80 | ||
Bandwidth Modify Charge | 01/04/2025 | 06/05/2025 | 6.97 | ||
Bandwidth Modify Charge | Note 17 | 07/05/2025 | 6.97 | ||
Bandwidth Modify Charge (for bandwidths upgrading to 80Mbit/s only) | Note 18 | 07/05/2025 | 0.00 | ||
Customer Premises Equipment Replacement - Replacement of damaged VDSL Modem | 01/07/2009 | 31/08/2018 | 26.00 | ||
Customer Premises Equipment Replacement - Replacement of damaged VDSL Modem | 01/09/2018 | withdrawn | |||
Customer Premises Equipment - Supply of Openreach G.Fast Modem | Note 12 | 30/07/2019 | 31/10/2020 | 55.00 | |
Customer Premises Equipment - Supply of Openreach G.Fast Modem | Note 12 | 01/11/2020 | 30/11/2021 | 57.50 | |
Customer Premises Equipment - Supply of Openreach G.Fast Modem | Note 12 | 01/12/2021 | 20/11/2022 | 69.00 | |
Customer Premises Equipment - Supply of Openreach G.Fast Modem | Note 12 | 21/11/2022 | 30/11/2024 | 72.00 | |
Customer Premises Equipment - Supply of Openreach G.Fast Modem | 01/12/2024 | Withdrawn | |||
Service cessation (GEA FTTC) | 01/07/2009 | 23/04/2010 | 4.90 | ||
Service cessation (GEA FTTC) | 24/04/2010 | 31/03/2011 | 5.22 | ||
Service cessation (GEA FTTC) | 01/04/2011 | 30/06/2017 | 5.37 | ||
Service cessation (GEA FTTC) | 01/07/2017 | 0.00 | |||
Managed Installation | |||||
Price per module | 02/07/2009 | 31/08/2011 | 12.00 | ||
Price per module | 01/09/2011 | 31/08/2018 | 12.50 | ||
Price per module | 01/09/2018 | withdrawn | |||
Base Module, CP Router & 1 PC (2 modules) | 02/07/2009 | 31/08/2011 | 24.00 | ||
Base Module, CP Router & 1 PC (2 modules) | 01/09/2011 | 31/08/2018 | 25.00 | ||
Base Module, CP Router & 1 PC (2 modules) | 01/09/2018 | withdrawn | |||
Set Top Box Reconnection (2 modules) | 02/07/2009 | 31/08/2011 | 24.00 | ||
Set Top Box Reconnection (2 modules) | 01/09/2011 | 31/03/2013 | 25.00 | ||
Set Top Box Reconnection (1 module) | 01/04/2013 | 31/08/2018 | 12.50 | ||
Set Top Box Reconnection (1 module) | 01/09/2018 | withdrawn | |||
Reconnection of end user devices (Price per module, each device to be assigned N number of modules) | 02/07/2009 | 31/08/2011 | 12.00 | ||
Reconnection of end user devices (Price per module, each device to be assigned N number of modules) | 01/09/2011 | 31/08/2018 | 12.50 | ||
Reconnection of end user devices (Price per module, each device to be assigned N number of modules) | 01/09/2018 | withdrawn | |||
Home Wiring Solution | 03/08/2010 | 31/08/2011 | TBC | ||
Home Wiring Solution | Note 3 | 01/09/2011 | 30/09/2022 | 0.00 | |
Home Wiring Solution | Note 3 | 01/10/2022 | Withdrawn | ||
Service Modification Charges | |||||
NTE Shift - Relocation of existing NTE | 01/07/2009 | See Service Products Price List - see link below | |||
Cancel/Amend/Modify - CRD Amend,order notes amend, order cancellation, etc. | Note 8 | 01/07/2009 | 19/06/2014 | 10.00 | |
Cancel/Amend/Modify - CRD Amend,order notes amend, order cancellation, etc. | Note 8 | 20/06/2014 | 31/03/2018 | 11.25 | |
Cancel/Amend/Modify - CRD Amend,order notes amend, order cancellation, etc. | Note 8 | 01/04/2018 | 31/03/2019 | 7.26 | |
Cancel/Amend/Modify - CRD Amend,order notes amend, order cancellation, etc. | Note 8 | 01/04/2019 | 31/03/2020 | 5.82 | |
Cancel/Amend/Modify - CRD Amend,order notes amend, order cancellation, etc. | Note 8 | 01/04/2020 | 30/06/2021 | 5.58 | |
Cancel/Amend/Modify - CRD Amend,order notes amend, order cancellation, etc. | Note 8 | 01/07/2021 | 31/03/2022 | 5.64 | |
Cancel/Amend/Modify - CRD Amend, order notes amend, order cancellation, etc. | Note 8, Note 14 | 01/04/2022 | 31/03/2023 | 5.86 | |
Cancel/Amend/Modify - CRD Amend, order notes amend, order cancellation, etc. | Note 8, Note 14 | 01/04/2023 | 31/03/2024 | 6.51 | |
Cancel/Amend/Modify - CRD Amend, order notes amend, order cancellation, etc. | Note 8, Note 14 | 01/04/2024 | 31/03/2025 | 6.80 | |
Cancel/Amend/Modify - CRD Amend, order notes amend, order cancellation, etc. | Note 8, Note 14 | 01/04/2025 | 6.97 | ||
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 01/07/2009 | 19/06/2014 | 10.00 | |
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 20/06/2014 | 31/03/2018 | 11.25 | |
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 01/04/2018 | 31/03/2019 | 7.26 | |
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 01/04/2019 | 31/03/2020 | 5.82 | |
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 01/04/2020 | 30/06/2021 | 5.58 | |
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 01/07/2021 | 31/03/2022 | 5.64 | |
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 01/04/2022 | 31/03/2023 | 5.86 | |
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 01/04/2023 | 31/03/2024 | 6.51 | |
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 01/04/2024 | 31/03/2025 | 6.80 | |
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. | Note 8 | 01/04/2025 | 6.97 | ||
Product Assurance Charges | |||||
Super Fast Visit Assure - Visit to customer premises | 01/07/2009 | 16/07/2011 | 0.00 | ||
Super Fast Visit Assure - Visit to customer premises | 17/07/2011 | 31/03/2013 | 155.00 | ||
Visit Assure - Visit to customer premises | 01/04/2013 | 12/04/2017 | 165.00 | ||
Visit Assure - Visit to customer premises | 13/04/2017 | 30/06/2021 | 130.00 | ||
Visit Assure - Visit to customer premises | 01/07/2021 | 31/03/2022 | 131.21 | ||
Visit Assure - Visit to customer premises | 01/04/2022 | 31/03/2023 | 136.40 | ||
Visit Assure - Visit to customer premises | 01/04/2023 | 31/03/2024 | 151.54 | ||
Visit Assure - Visit to customer premises | 01/04/2024 | 31/03/2025 | 158.51 | ||
Visit Assure - Visit to customer premises | 01/04/2025 | 162.16 | |||
Superfast Recharge - visit plus internal module | 01/04/2018 | 30/06/2018 | 94.03 | ||
Superfast Recharge - visit plus internal module | 01/07/2018 | 30/04/2020 | 107.00 | ||
Superfast Recharge - visit plus internal module | 01/05/2020 | Withdrawn | |||
Superfast Recharge - visit plus internal and external module | 01/04/2018 | 30/04/2018 | 166.00 | ||
Superfast Recharge - visit plus internal and external module | 01/05/2018 | 30/04/2020 | 142.00 | ||
Superfast Recharge - visit plus internal and external module | 01/05/2020 | Withdrawn | |||
Fibre Broadband Boost: Mon to Fri | note 10 | 01/05/2018 | 30/04/2020 | 139.00 | |
Fibre Broadband Boost: Mon to Fri | note 10 | 01/05/2020 | Withdrawn | ||
Fibre Broadband Boost: Saturday | note 10 | 01/05/2018 | 30/04/2020 | 185.00 | |
Fibre Broadband Boost: Saturday | note 10 | 01/05/2020 | Withdrawn | ||
Right When Tested | |||||
Right When Tested - Charge for submitting a trouble ticket proved RWT via the SMC | 01/07/2009 | See LLU Price list - MPF Standard Line Test - see link below | |||
Right When Tested - Charge for clearing a trouble ticket proved RWT in the Network | 01/07/2009 | 19/06/2013 | See LLU Price list - Network RWT - see link below | ||
Right When Tested - Charge for clearing a trouble ticket proved RWT in the Network | 20/06/2013 | Withdrawn | |||
Appointment Charges | |||||
FTTC Expedite | Note 2 | 01/07/2010 | 31/10/2011 | 158.40 | |
FTTC Expedite | Note 2 | 01/11/2011 | 31/03/2013 | 180.00 | |
Point of Sale FTTC Expedite | Note 2 | 01/11/2011 | 31/03/2013 | 180.00 | |
GEA-FTTC Expedite / Point of Sale GEA-FTTC Expedite | Note 2 | 01/04/2013 | 30/04/2018 | 196.00 | |
GEA-FTTC Expedite / Point of Sale GEA-FTTC Expedite | Note 2 | 01/05/2018 | 31/03/2024 | 100.10 | |
GEA-FTTC Expedite / Point of Sale GEA-FTTC Expedite | Note 2 | 01/04/2024 | 31/03/2025 | 110.00 | |
GEA-FTTC Expedite / Point of Sale GEA-FTTC Expedite | Note 2 | 01/04/2025 | 125.00 | ||
Flexible Appointments | See Service Products Price List | ||||
PCP Only Install L2C Fulfilment Charge | Note 7 | 31/12/2013 | 30/11/2023 | 12.50 | |
PCP Only Install L2C Fulfilment Charge | Note 7 | 01/12/2023 | 14.00 | ||
Bulk Checker Charges | |||||
Bulk Line Checker (per file) | 29/06/2010 | 17/09/2012 | 777.60 | ||
Bulk Line Checker (per file) | 18/09/2012 | 19/06/2014 | 850.58 | ||
Bulk Line Checker (per file) | 20/06/2014 | 30/06/2018 | 877.70 | ||
Bulk Line Checker (per file) | 01/07/2018 | 31/07/2019 | 95.00 | ||
Bulk Line Checker (per file) | 01/08/2019 | 31/10/2020 | 70.00 | ||
Bulk Line Checker (per file) | 01/11/2020 | 30/09/2021 | 125.00 | ||
Bulk Line Checker (per file) | 01/10/2021 | 20/11/2022 | 120.00 | ||
Bulk Line Checker (per file) | 21/11/2022 | 30/11/2024 | 130.00 | ||
Bulk Line Checker (per file) | 01/12/2024 | 110.00 | |||
Bulk Modification of FTTC to higher speed Bandwidths | 23/05/2016 | 30/04/2018 | 0.20 | ||
Bulk Modification of FTTC to higher speed Bandwidths | 01/05/2018 | 31/08/2019 | 0.16 | ||
Bulk Modification of FTTC to higher speed Bandwidths | 01/09/2019 | 30/09/2022 | 0.15 | ||
Bulk Modification | Note 13 | 01/10/2022 | 31/05/2023 | 0.15 | |
Bulk Modification | Note 13 | 01/06/2023 | 31/03/2024 | 0.17 | |
Bulk Modification | Note 13 | 01/04/2024 | 30/09/2024 | 0.18 | |
Bulk Modification | Note 13 | 01/10/2024 | 0.21 |
Special Offers are available and can be found using the Special Offer link on the main price list page.
●This can be found at: http://www.openreach.co.uk/orpg/home/products/pricing/loadPricing.do
●Select Section 8 Special Offers
●Scroll down the page and all Super Fast Access Special Offer prices can be found in Section 8.4
Feature | Note | Operative date | Until | Annual Rental £ Exc VAT |
---|---|---|---|---|
Up to 18Mbit/s downstream and up to 2Mbit/s upstream | Note 11 | 01/08/2018 | 30/06/2021 | 48.00 |
Up to 18Mbit/s downstream and up to 2Mbit/s upstream | Note 11 | 01/07/2021 | 31/03/2022 | 48.48 |
Up to 18Mbit/s downstream and up to 2Mbit/s upstream | Note 11 | 01/04/2022 | 31/03/2023 | 50.52 |
Up to 18Mbit/s downstream and up to 2Mbit/s upstream | Note 11 | 01/04/2023 | 31/03/2024 | 56.04 |
Up to 18Mbit/s downstream and up to 2Mbit/s upstream | Note 11 | 01/04/2024 | 31/03/2025 | 58.56 |
Up to 18Mbit/s downstream and up to 2Mbit/s upstream | Note 11 | 01/04/2025 | 59.88 | |
Up to 40Mbit/s downstream and up to 2Mbit/s upstream (including Simultaneous Provide) | 01/07/2009 | 30/06/2021 | 82.80 | |
Up to 40Mbit/s downstream and up to 2Mbit/s upstream (including Simultaneous Provide) | 01/07/2021 | 31/03/2022 | 83.52 | |
Up to 40Mbit/s downstream and up to 2Mbit/s upstream (including Simultaneous Provide) | 01/04/2022 | 31/03/2023 | 87.00 | |
Up to 40Mbit/s downstream and up to 2Mbit/s upstream (including Simultaneous Provide) | 01/04/2023 | 31/03/2024 | 96.60 | |
Up to 40Mbit/s downstream and up to 2Mbit/s upstream (including Simultaneous Provide) | 01/04/2024 | 31/03/2025 | 101.04 | |
Up to 40Mbit/s downstream and up to 2Mbit/s upstream (including Simultaneous Provide) | Note 15 | 01/04/2025 | 103.32 | |
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | 01/09/2011 | 31/03/2018 | 88.80 | |
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | Note 9 | 01/04/2018 | 31/03/2019 | 69.59 |
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | Note 9 | 01/04/2019 | 31/03/2020 | 61.51 |
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | Note 9 | 01/04/2020 | 30/06/2021 | 59.97 |
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | Note 9 | 01/07/2021 | 31/03/2022 | 60.54 |
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | Note 9 | 01/04/2022 | 31/03/2023 | 62.93 |
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | Note 9 | 01/04/2023 | 31/03/2024 | 69.91 |
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | Note 9 | 01/04/2024 | 31/03/2025 | 73.12 |
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | Note 9 | 01/04/2025 | 74.82 | |
Up to 55Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | 16/01/2016 | 30/06/2021 | 100.80 | |
Up to 55Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | 01/07/2021 | 31/03/2022 | 101.76 | |
Up to 55Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | 01/04/2022 | 31/03/2023 | 105.96 | |
Up to 55Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | 01/04/2023 | 31/03/2024 | 117.72 | |
Up to 55Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | 01/04/2024 | 31/03/2025 | 123.12 | |
Up to 55Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) | 01/04/2025 | 125.88 | ||
Up to 80Mbit/s downstream and up to 20Mbit/s upstream (including Simultaneous Provide) | 10/04/2012 | 30/06/2021 | 119.40 | |
Up to 80Mbit/s downstream and up to 20Mbit/s upstream (including Simultaneous Provide) | 01/07/2021 | 31/03/2022 | 120.48 | |
Up to 80Mbit/s downstream and up to 20Mbit/s upstream (including Simultaneous Provide) | 01/04/2022 | 31/03/2023 | 125.52 | |
Up to 80Mbit/s downstream and up to 20Mbit/s upstream (including Simultaneous Provide) | 01/04/2023 | 31/03/2024 | 139.44 | |
Up to 80Mbit/s downstream and up to 20Mbit/s upstream (including Simultaneous Provide) | 01/04/2024 | 31/03/2025 | 145.80 | |
Up to 80Mbit/s downstream and up to 20Mbit/s upstream (including Simultaneous Provide) | 01/04/2025 | 149.04 | ||
Up to 160Mbit/s downstream and up to 30Mbit/s upstream (including Simultaneous Provide) | 30/07/2019 | 30/06/2021 | 137.88 | |
Up to 160Mbit/s downstream and up to 30Mbit/s upstream (including Simultaneous Provide) | 01/07/2021 | 31/03/2022 | 139.20 | |
Up to 160Mbit/s downstream and up to 30Mbit/s upstream (including Simultaneous Provide) | 01/04/2022 | 31/03/2023 | 144.96 | |
Up to 160Mbit/s downstream and up to 30Mbit/s upstream (including Simultaneous Provide) | 01/04/2023 | 31/03/2024 | 160.92 | |
Up to 160Mbit/s downstream and up to 30Mbit/s upstream (including Simultaneous Provide) | 01/04/2024 | 31/03/2025 | 168.24 | |
Up to 160Mbit/s downstream and up to 30Mbit/s upstream (including Simultaneous Provide) | 01/04/2025 | 172.08 | ||
Up to 330Mbit/s downstream and up to 50Mbit/s upstream (including Simultaneous Provide) | 30/07/2019 | 30/06/2021 | 179.88 | |
Up to 330Mbit/s downstream and up to 50Mbit/s upstream (including Simultaneous Provide) | 01/07/2021 | 31/03/2022 | 181.56 | |
Up to 330Mbit/s downstream and up to 50Mbit/s upstream (including Simultaneous Provide) | 01/04/2022 | 31/03/2023 | 189.12 | |
Up to 330Mbit/s downstream and up to 50Mbit/s upstream (including Simultaneous Provide) | 01/04/2023 | 31/03/2024 | 210.00 | |
Up to 330Mbit/s downstream and up to 50Mbit/s upstream (including Simultaneous Provide) | 01/04/2024 | 31/03/2025 | 219.60 | |
Up to 330Mbit/s downstream and up to 50Mbit/s upstream (including Simultaneous Provide) | 01/04/2025 | 224.64 |
Feature | Note | Operative date | Until | Percentage adjustment |
---|---|---|---|---|
Fibre to the Cabinet Held to Term charges | note 4 | 01/09/2011 | 11/10/2017 | 9% |
Fibre to the Cabinet Held to Term charges | note 4 | 12/10/2017 | Not applicable |
Notes:
1) A Simultaneous Provide is where the service is provided as part of a new copper line provision on either MPF or WLR with the same CCD as a new provision of the GEA FTTC Product. The prices shown here refer to the GEA FTTC element of that provide only.
2) The Expedite charge is payable in addition to the FTTC connection charge. The charge is only raised if the revised Customer Committed Date is met.
3) This is not offered as a discrete product but instead is part of the engineer installation connection variants. It will continue to appear as a zero cost transaction on your bill for information.
4) Hold to Term Charges become due when a Service is ceased before the expiry of any minimum period of service for that Service. The minimum period of service for Fibre to the Cabinet products is 1 month from 12/10/2017. Until this point the minimum period of service was 12 months (unless the GEA-FTTC service had migrated between Communications Providers when a minimum period of service of one month following such migration applied). The rebate on Hold to Term charges set out here was only applicable when the minimum period of service was 12 months and was payable one month in arrears on a Communications Providers total Hold to Term charges payable in the previous month. The percentage was based on data from the Office of National Statistics, Property Transactions report.
5) In addition to the connection charge, an additional Managed Installation Event Charge will apply as defined in the Transaction charges section.
6) The price of the Base Module of Managed Install is included within this charge.
7) The PCP Only Install charge is charged if a specific appointment slot is selected to complete the order. Additional appointment event charges will further apply if a Flexible or Expedited appointment is selected for the PCP Only provision.
8) Cancellation charges are compensatory and not subject to VAT. Upstream Bandwidth, DLM Policy, Remote ID, Downstream Bandwidth, Downstream Data Bandwidth are chargable modifies.
9) Openreach amends its process for billing for products where the annual charge is not divisible by twelve. Openreach will flex the monthly charges by a penny up or down, so that over the course of the year the total price charged is no more than the charge on the price list. The flexing of the monthly charges is shown below.
For the year 1 April 2018 to 31 March 2019: April £5.79, May to March £5.80
For the year 1 April 2019 to 31 March 2020: April to August £5.12, September to March £5.13
For the year 1 April 2020 to 31 March 2021: April to June £4.99, July to March £5.00
For the year 1 April 2021 to 31 March 2022: April to June £5.00, July to October £5.05, November to March £5.04
For the year 1 April 2022 to 31 March 2023: April to August: £5.25, September to March: £5.24
For the year 1 April 2023 to 31 March 2024: April to August: £5.82, September to March: £5.83
For the Year 1 April 2024 to 31 March 2025: April to November: £6.09, December to March: £6.10
For the year 1 April 2025 to 31 March 2026: April to September: £6.24, October to March: £6.23
10) This charge is raised on all valid Broadband Boost orders. The total quarterly charge will be subject to a rebate of 11.7%, paid per quarter. The rebate will be applied against the total quarterly charges, to reflect completed Broadband Boost activities.
11) Not available for new supply.
12) In the event a modem replacement is required due to customer damage TRC charges will be raised in addition to this equipment charge.
13) Applies to bulk orders for Bandwidth Modify to a higher Bandwidth and DLM Policy Modify. Charged in addition to the standard modify charge per order.
14) From 18 October 2022, Amend charges will also apply in the event of direct end customer contact on behalf of the Communications Provider, where the end customer has requested a change in the required date in direct communication with Openreach.
15) FTTC 40Mbit/s / 2Mbit/s bandwidth was withdrawn from new supply on 24/04/2025.
16) Not in use.
17) This does not apply to bandwidth upgrades to 80/20Mbit/s.
18) The price applies only to the upward modification in bandwidth of existing MPF+FTTC lines to 80/20Mbit/s speed. Any other modification is subject to the published price for Bandwidth Modify charge. CPs will be charged the prevailing Bandwidth Modify price and then rebated on a quarterly basis in line with the customer briefing NGA003/25, found at https://www.openreach.co.uk/cpportal/updates/briefings.
CRD Amend, Order notes amend, Outer Tag amend, Chargable Cancels, Order Cancellation are chargable amends
NTE Shift - can be found at: http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
MPF Standard Line Test can be found at the LLU Price List: Price List (openreach.co.uk)
Repair Service Levels
Details can be found under the Service Products section of the price list, that can be found at:
Product prices (openreach.co.uk)
Other Charges
Time Related Charges
For Time Related Charges (applicable to Out of Hours Visits, Abortive Visits, Equipment Testing, etc.) refer to the Service Products section of the price list, that can be found at:
Product prices (openreach.co.uk)