Feature | Note | Operative date | Until | Charge £ Exc VAT |
---|---|---|---|---|
Data Report per MDF site | 01/03/2008 | 30/11/2009 | 101.04 | |
Data Report per MDF site | 01/12/2009 | Withdrawn | ||
Full survey | 01/03/2008 | 31/12/2013 | 350.00 | |
Full survey | 01/01/2014 | 30/04/2018 | 252.40 | |
Full survey | 01/05/2018 | 31/03/2022 | 244.52 | |
Full survey | 01/04/2022 | 31/03/2023 | 256.70 | |
Full survey | 01/04/2023 | 31/03/2024 | 298.76 | |
Full survey | 01/04/2024 | 13/04/2025 | 312.60 | |
Full survey | 14/04/2025 | 320.08 | ||
Full Survey non-attendance | 01/03/2008 | 31/07/2015 | 85.00 | |
Full Survey non-attendance | 01/08/2015 | 31/07/2019 | 90.00 | |
Full Survey non-attendance | 01/08/2019 | 31/10/2020 | 70.00 | |
Full Survey non-attendance | 01/11/2020 | 31/03/2022 | 67.50 | |
Full Survey non-attendance | 01/04/2022 | 30/06/2023 | 70.90 | |
Full Survey non-attendance | 01/07/2023 | 78.80 | ||
Survey Cancellation (prior to meeting) - (post meeting full price applies) | Notes 1 & 6 | 01/03/2008 | 31/05/2018 | 75.00 |
Survey Cancellation (prior to meeting) - (post meeting full price applies) | Notes 1 & 6 | 01/06/2018 | 30/09/2019 | 66.65 |
Survey Cancellation (prior to meeting) - (post meeting full price applies) | Notes 1 & 6 | 01/10/2019 | 31/12/2020 | 71.63 |
Survey Cancellation (prior to meeting) - (post meeting full price applies) | Notes 1 & 6 | 01/01/2021 | 31/03/2022 | 82.07 |
Survey Cancellation (prior to meeting) - (post meeting full price applies) | Notes 1 & 6 | 01/04/2022 | 30/06/2023 | 86.20 |
Survey Cancellation (prior to meeting) - (post meeting full price applies) | Notes 1 & 6 | 01/07/2023 | 95.80 |
Feature | Note | Operative date | Until | Connection Charge £ Exc VAT |
---|---|---|---|---|
This price is applicable to the Connection of CP Duct by Openreach to Openreach's Existing Network Joint Box and will be known as a Break-In (this charge will be included in the overall duct charges applicable) This price will not apply to Break-In at other jointing chambers such as manholes where this work will be subject to ECC charges. | 18/06/2009 | 30/04/2018 | 600.00 | |
This price is applicable to the Connection of CP Duct by Openreach to Openreach's Existing Network Joint Box and will be known as a Break-In (this charge will be included in the overall duct charges applicable) This price will not apply to Break-In at other jointing chambers such as manholes where this work will be subject to ECC charges. | 01/05/2018 | 30/09/2019 | 566.35 | |
This price is applicable to the Connection of CP Duct by Openreach to Openreach's Existing Network Joint Box and will be known as a Break-In (this charge will be included in the overall duct charges applicable) This price will not apply to Break-In at other jointing chambers such as manholes where this work will be subject to ECC charges. | 01/10/2019 | 30/04/2020 | 581.41 | |
This price is applicable to the Connection of CP Duct by Openreach to Openreach's Existing Network Joint Box and will be known as a Break-In (this charge will be included in the overall duct charges applicable) | 7 | 01/05/2020 | 31/03/2022 | 139.21 |
This price is applicable to the Connection of CP Duct by Openreach to Openreach's Existing Network Joint Box and will be known as a Break-In (this charge will be included in the overall duct charges applicable) | 7 | 01/04/2022 | 30/06/2023 | 137.51 |
This price is applicable to the Connection of CP Duct by Openreach to Openreach's Existing Network Joint Box and will be known as a Break-In (this charge will be included in the overall duct charges applicable) | 7 | 01/07/2023 | 31/05/2024 | 149.77 |
This price is applicable to the Connection of CP Duct by Openreach to Openreach's Existing Network Joint Box and will be known as a Break-In (this charge will be included in the overall duct charges applicable) | 7 | 01/06/2024 | 30/06/2025 | 222.98 |
This price is applicable to the Connection of CP Duct by Openreach to Openreach's Existing Network Joint Box and will be known as a Break-In (this charge will be included in the overall duct charges applicable) | 7 | 01/07/2025 | 245.11 |
Feature | Operative date | Until | Charge £ Exc VAT |
---|---|---|---|
Sub Loop Connection charge (MPF Transfer) | 30/06/2005 | 29/06/2008 | 99.09 |
Sub Loop Connection charge (MPF Transfer) | 30/06/2008 | 31/05/2018 | 127.61 |
Sub Loop Connection charge (MPF Transfer) | 01/06/2018 | 30/09/2019 | 123.26 |
Sub Loop Connection charge (MPF Transfer) | 01/10/2019 | 28/02/2021 | 135.95 |
Sub Loop Connection charge (MPF Transfer) | 01/03/2021 | 31/03/2022 | 135.23 |
Sub Loop Connection charge (MPF Transfer) | 01/04/2022 | 30/06/2023 | 142.00 |
Sub Loop Connection charge (MPF Transfer) | 01/07/2023 | 157.80 | |
Sub Loop MPF Connection charge - New Provide - Standard | 30/06/2005 | 29/06/2008 | 151.97 |
Sub Loop MPF Connection charge - New Provide - Standard | 30/06/2008 | 30/11/2011 | 106.62 |
Sub Loop MPF Connection charge - New Provide - Standard | 01/12/2011 | 31/05/2018 | 127.61 |
Sub Loop MPF Connection charge - New Provide - Standard | 01/06/2018 | 30/09/2019 | 123.26 |
Sub Loop MPF Connection charge - New Provide - Standard | 01/10/2019 | 28/02/2021 | 135.95 |
Sub Loop MPF Connection charge - New Provide - Standard | 01/03/2021 | 31/03/2022 | 135.23 |
Sub Loop MPF Connection charge - New Provide - Standard | 01/04/2022 | 30/06/2023 | 142.00 |
Sub Loop MPF Connection charge - New Provide - Standard | 01/07/2023 | 157.80 | |
Sub Loop - Shared MPF Connection | 30/06/2005 | 29/06/2008 | 99.09 |
Sub Loop - Shared MPF Connection | 30/06/2008 | 30/11/2011 | 127.61 |
Sub Loop - Shared MPF Connection (including SMPF Transfer) | 01/12/2011 | 31/07/2018 | 115.00 |
Sub Loop - Shared MPF Connection (including SMPF Transfer) | 01/08/2018 | 30/09/2019 | 116.41 |
Sub Loop - Shared MPF Connection (including SMPF Transfer) | 01/10/2019 | 28/02/2021 | 125.75 |
Sub Loop - Shared MPF Connection (including SMPF Transfer) | 01/03/2021 | 31/03/2022 | 125.55 |
Sub Loop - Shared MPF Connection (including SMPF Transfer) | 01/04/2022 | 30/06/2023 | 131.80 |
Sub Loop - Shared MPF Connection (including SMPF Transfer) | 01/07/2023 | 146.40 | |
SLU Expedite | 07/08/2013 | 31/08/2013 | 167.32 |
SLU Expedite | 01/09/2013 | 30/04/2018 | 145.00 |
SLU Expedite | 01/05/2018 | 31/05/2024 | 100.10 |
SLU Expedite | 01/06/2024 | 30/06/2025 | 110.00 |
SLU Expedite | 01/07/2025 | 125.00 | |
Sub Loop MPF Rental per annum | 30/06/2005 | 31/05/2018 | 93.96 |
Sub Loop MPF Rental per annum | 01/06/2018 | 30/09/2019 | 77.40 |
Sub Loop MPF Rental per annum | 01/10/2019 | 31/12/2020 | 78.57 |
Sub Loop MPF Rental per annum | 01/01/2021 | 31/03/2022 | 79.03 |
Sub Loop MPF Rental per annum | 01/04/2022 | 30/06/2023 | 79.74 |
Sub Loop MPF Rental per annum | 01/07/2023 | 31/05/2024 | 88.56 |
Sub Loop MPF Rental per annum | 01/06/2024 | 30/06/2025 | 92.64 |
Sub Loop MPF Rental per annum | 01/07/2025 | 94.80 | |
Sub Loop Shared MPF Rental per annum | 30/06/2005 | 31/05/2018 | 11.47 |
Sub Loop Shared MPF Rental per annum | 01/06/2018 | 30/09/2019 | 4.45 |
Sub Loop Shared MPF Rental per annum | 01/10/2019 | 31/12/2020 | 4.52 |
Sub Loop Shared MPF Rental per annum | 01/01/2021 | 31/03/2022 | 5.41 |
Sub Loop Shared MPF Rental per annum | 01/04/2022 | 30/06/2023 | 5.46 |
Sub Loop Shared MPF Rental per annum | 01/07/2023 | 31/05/2024 | 6.12 |
Sub Loop Shared MPF Rental per annum | 01/06/2024 | 30/06/2025 | 7.08 |
Sub Loop Shared MPF Rental per annum | 01/07/2025 | 7.32 | |
Sub Loop MPF New Line Minor Network Intervention | 30/06/2005 | 29/06/2008 | 299.35 |
Sub Loop MPF New Line Minor Network Intervention | 30/06/2008 | Withdrawn | |
Sub Loop MPF New Line Major Network Intervention | 30/06/2005 | 29/06/2008 | 626.95 |
Sub Loop MPF New Line Major Network Intervention | 30/06/2008 | Withdrawn | |
Sub Loop MPF New Line Small Network Build | 30/06/2005 | 29/06/2008 | 2759.86 |
Sub Loop MPF New Line Small Network Build | 30/06/2008 | Withdrawn | |
Sub Loop Hand-back charge - Transfer | 30/06/2005 | 29/06/2008 | 29.00 |
Sub Loop Hand-back charge - Transfer | 30/06/2008 | Withdrawn |
Feature | Note | Operative date | Until | Charge £ Exc VAT |
---|---|---|---|---|
Sub Loop Cease charge | 31/12/2000 | 29/06/2008 | 29.00 | |
Sub Loop Cease charge | 30/06/2008 | 31/07/2015 | 100.67 | |
Sub Loop Cease charge | 01/08/2015 | 31/07/2018 | 120.21 | |
Sub Loop Cease charge | 01/08/2018 | 31/07/2019 | 140.02 | |
Sub Loop Cease charge | 01/08/2019 | 31/03/2022 | 139.82 | |
Sub Loop Cease charge | 01/04/2022 | 30/06/2023 | 60.00 | |
Sub Loop Cease charge | 01/07/2023 | 65.00 | ||
PCP Extension Upgrade | Note 2 | 01/03/2008 | 31/07/2015 | 1,829.11 |
PCP Extension Upgrade | Note 2 | 01/08/2015 | 31/05/2018 | 1,596.01 |
PCP Extension Upgrade | Note 2 | 01/06/2018 | 31/07/2019 | 1,455.38 |
PCP Extension Upgrade | Note 2 | 01/08/2019 | 31/12/2020 | 1,435.38 |
PCP Extension Upgrade | Note 2 | 01/01/2021 | 31/03/2022 | 2,364.20 |
PCP Extension Upgrade | Note 2 | 01/04/2022 | 30/06/2023 | 2,482.40 |
PCP Extension Upgrade | Note 2 | 01/07/2023 | 2,757.90 | |
Shared MPF/MPF Enhanced Care per annum | 30/06/2008 | 26/05/2011 | 37.54 | |
Shared MPF/MPF Enhanced Care per annum | 27/05/2011 | Withdrawn | ||
Shared MPF/MPF Re-termination tie pair | 30/06/2008 | 31/07/2015 | 100.67 | |
Shared MPF/MPF Re-termination tie pair | 01/08/2015 | 31/07/2018 | 120.21 | |
Shared MPF/MPF Re-termination tie pair | 01/08/2018 | 31/07/2019 | 140.02 | |
Shared MPF/MPF Re-termination tie pair | 01/08/2019 | 31/03/2022 | 139.82 | |
Shared MPF/MPF Re-termination tie pair | 01/04/2022 | 30/06/2023 | 146.80 | |
Shared MPF/MPF Re-termination tie pair | 01/07/2023 | 163.10 | ||
Shared MPF /MPF Order rejected at initial validation | 30/06/2008 | 31/07/2015 | 7.14 | |
Shared MPF /MPF Order rejected at initial validation | 01/08/2015 | 31/07/2018 | 8.53 | |
Shared MPF /MPF Order rejected at initial validation | 01/08/2018 | 31/07/2019 | 19.33 | |
Shared MPF /MPF Order rejected at initial validation | 01/08/2019 | 31/12/2020 | 18.26 | |
Shared MPF /MPF Order rejected at initial validation | 01/01/2021 | 31/03/2022 | 21.02 | |
Shared MPF /MPF Order rejected at initial validation | 01/04/2022 | 30/06/2023 | 22.10 | |
Shared MPF /MPF Order rejected at initial validation | 01/07/2023 | 24.60 | ||
Shared MPF/MPF Order rejected at detailed evaluation | 30/06/2008 | 31/07/2015 | 14.28 | |
Shared MPF/MPF Order rejected at detailed evaluation | 01/08/2015 | 31/07/2018 | 17.05 | |
Shared MPF/MPF Order rejected at detailed evaluation | 01/08/2018 | 31/07/2019 | 38.66 | |
Shared MPF/MPF Order rejected at detailed evaluation | 01/08/2019 | 31/12/2020 | 36.51 | |
Shared MPF/MPF Order rejected at detailed evaluation | 01/01/2021 | 31/03/2022 | 42.05 | |
Shared MPF/MPF Order rejected at detailed evaluation | 01/04/2022 | 30/06/2023 | 44.20 | |
Shared MPF/MPF Order rejected at detailed evaluation | 01/07/2023 | 49.10 | ||
Cancellation of Shared MPF/MPF Order | 30/06/2008 | 31/07/2015 | 7.14 | |
Cancellation of Shared MPF/MPF Order | Note 6 | 01/08/2015 | 31/07/2018 | 10.83 |
Cancellation of Shared MPF/MPF Order | Note 6 | 01/08/2018 | 31/07/2019 | 19.33 |
Cancellation of Shared MPF/MPF Order | Note 6 | 01/08/2019 | 31/12/2020 | 18.26 |
Cancellation of Shared MPF/MPF Order | Note 6 | 01/01/2021 | 31/03/2022 | 21.02 |
Cancellation of Shared MPF/MPF Order | Note 6 | 01/04/2022 | 30/06/2023 | 22.10 |
Cancellation of Shared MPF/MPF Order | Note 6 | 01/07/2023 | 24.60 | |
Allowable change to Shared MPF/MPF Order | 30/06/2008 | 31/07/2015 | 7.14 | |
Allowable change to Shared MPF/MPF Order | 01/08/2015 | 31/07/2018 | 10.83 | |
Allowable change to Shared MPF/MPF Order | 01/08/2018 | 31/07/2019 | 19.33 | |
Allowable change to Shared MPF/MPF Order | 01/08/2019 | 31/12/2020 | 18.26 | |
Allowable change to Shared MPF/MPF Order | 01/01/2021 | 31/03/2022 | 21.02 | |
Allowable change to Shared MPF/MPF Order | 01/04/2022 | 30/06/2023 | 22.10 | |
Allowable change to Shared MPF/MPF Order | 01/07/2023 | 24.60 | ||
Sub loop standard line test - RWT From 30/06/08 this will be charged for via Time Related charges - See below | Note 3 | 30/06/2005 | 29/06/2008 | 99.09 |
Sub loop standard line test - RWT From 30/06/08 this will be charged for via Time Related charges - See below | Note 3 | 30/06/2008 | ||
Sub loop resistance test | 30/06/2005 | 29/06/2008 | 99.09 | |
Sub loop resistance test | 30/06/2008 | withdrawn | ||
Sub loop insertion loss | 30/06/2005 | 29/06/2008 | ||
Sub loop insertion loss | 30/06/2008 | withdrawn |
Feature | Operative date | Until | Charge £ £ Exc VAT |
---|---|---|---|
SLU SMPF to GEA-FTTC (Same /Different CP) | 20/06/2015 | 31/07/2018 | 168.26 |
SLU SMPF to GEA-FTTC (Same /Different CP) | 01/08/2018 | See GEA-FTTC Price List | |
GEA-FTTC to SLU SMPF (Same /Different CP) | 20/06/2015 | 31/07/2018 | 120.37 |
GEA-FTTC to SLU SMPF (Same /Different CP) | 01/08/2018 | 30/09/2019 | 226.49 |
GEA-FTTC to SLU SMPF (Same /Different CP) | 01/10/2019 | 31/12/2020 | 234.08 |
GEA-FTTC to SLU SMPF (Same /Different CP) | 01/01/2021 | 31/03/2022 | 275.72 |
GEA-FTTC to SLU SMPF (Same /Different CP) | 01/04/2022 | 30/06/2023 | 289.50 |
GEA-FTTC to SLU SMPF (Same /Different CP) | 01/07/2023 | 321.60 | |
WLR PSTN + SLU SMPF to SLU MPF with/without number export | 20/06/2015 | 31/07/2018 | 203.87 |
WLR PSTN + SLU SMPF to SLU MPF with/without number export | 01/08/2018 | 31/07/2019 | 294.58 |
WLR PSTN + SLU SMPF to SLU MPF with/without number export | 01/08/2019 | 31/12/2020 | 292.18 |
WLR PSTN + SLU SMPF to SLU MPF with/without number export | 01/01/2021 | 31/03/2022 | 378.59 |
WLR PSTN + SLU SMPF to SLU MPF with/without number export | 01/04/2022 | 30/06/2023 | 397.50 |
WLR PSTN + SLU SMPF to SLU MPF with/without number export | 01/07/2023 | 441.60 | |
BT Classic PSTN + SLU SMPF to SLU MPF with number export | 20/06/2015 | 31/07/2018 | 203.87 |
BT Classic PSTN + SLU SMPF to SLU MPF with number export | 01/08/2018 | 31/07/2019 | 294.58 |
BT Classic PSTN + SLU SMPF to SLU MPF with number export | 01/08/2019 | 31/12/2020 | 292.18 |
BT Classic PSTN + SLU SMPF to SLU MPF with number export | 01/01/2021 | 31/03/2022 | 378.59 |
BT Classic PSTN + SLU SMPF to SLU MPF with number export | 01/04/2022 | 30/06/2023 | 397.50 |
BT Classic PSTN + SLU SMPF to SLU MPF with number export | 01/07/2023 | 441.60 | |
WLR PSTN + SLU SMPF to WLR PSTN + SLU SMPF (change of WLR3 CP, retaining SLU SMPF) | 20/06/2015 | 31/07/2018 | 6.28 |
WLR PSTN + SLU SMPF to WLR PSTN + SLU SMPF (change of WLR3 CP, retaining SLU SMPF) | 01/08/2018 | See WLR Transfer on WLR Price list | |
BT Classic PSTN + SLU SMPF to WLR PSTN + SLU SMPF (change of PSTN CP retaining SLU SMPF) | 20/06/2015 | 31/07/2018 | 6.28 |
BT Classic PSTN + SLU SMPF to WLR PSTN + SLU SMPF (change of PSTN CP retaining SLU SMPF) | 01/08/2018 | See WLR Transfer on WLR Price list | |
WLR3 PSTN to SLU MPF without number export (Same/Different CP) | 20/06/2015 | 31/07/2018 | 127.61 |
WLR3 PSTN to SLU MPF without number export (Same/Different CP) | 01/08/2018 | 30/09/2019 | 172.91 |
WLR3 PSTN to SLU MPF without number export (Same/Different CP) | 01/10/2019 | 31/12/2020 | 191.91 |
WLR3 PSTN to SLU MPF without number export (Same/Different CP) | 01/01/2021 | 31/03/2022 | 232.13 |
WLR3 PSTN to SLU MPF without number export (Same/Different CP) | 01/04/2022 | 30/06/2023 | 243.70 |
WLR3 PSTN to SLU MPF without number export (Same/Different CP) | 01/07/2023 | 270.80 | |
SLU MPF to WLR3 PSTN (Same/Different CP) | 20/06/2015 | 31/07/2018 | 142.22 |
SLU MPF to WLR3 PSTN (Same/Different CP) | 01/08/2018 | See WLR Price list | |
LLU MPF + GEA- FTTC to SLU MPF (Same/Different CP) | 20/06/2015 | 31/07/2018 | 181.81 |
LLU MPF + GEA- FTTC to SLU MPF (Same/Different CP) | 01/08/2018 | 30/09/2019 | 222.72 |
LLU MPF + GEA- FTTC to SLU MPF (Same/Different CP) | 01/10/2019 | 31/12/2020 | 230.30 |
LLU MPF + GEA- FTTC to SLU MPF (Same/Different CP) | 01/01/2021 | 31/03/2022 | 271.31 |
LLU MPF + GEA- FTTC to SLU MPF (Same/Different CP) | 01/04/2022 | 30/06/2023 | 284.90 |
LLU MPF + GEA- FTTC to SLU MPF (Same/Different CP) | 01/07/2023 | 316.50 | |
WLR3 PSTN + GEA- FTTC to SLU MPF with/without number export (Same/Different CP) | 20/06/2015 | 31/07/2018 | 157.39 |
WLR3 PSTN + GEA- FTTC to SLU MPF with/without number export (Same/Different CP) | 01/08/2018 | 30/09/2019 | 222.72 |
WLR3 PSTN + GEA- FTTC to SLU MPF with/without number export (Same/Different CP) | 01/10/2019 | 31/12/2020 | 230.30 |
WLR3 PSTN + GEA- FTTC to SLU MPF with/without number export (Same/Different CP) | 01/01/2021 | 31/03/2022 | 271.31 |
WLR3 PSTN + GEA- FTTC to SLU MPF with/without number export (Same/Different CP) | 01/04/2022 | 30/06/2023 | 284.90 |
WLR3 PSTN + GEA- FTTC to SLU MPF with/without number export (Same/Different CP) | 01/07/2023 | 316.50 | |
WLR3 PSTN + SMPF to SLU MPF without number port (Same/Different CP) | 20/06/2015 | 31/07/2018 | 168.30 |
WLR3 PSTN + SMPF to SLU MPF without number port (Same/Different CP) | 01/08/2018 | 30/09/2019 | 172.91 |
WLR3 PSTN + SMPF to SLU MPF without number port (Same/Different CP) | 01/10/2019 | 31/12/2020 | 191.91 |
WLR3 PSTN + SMPF to SLU MPF without number port (Same/Different CP) | 01/01/2021 | 31/03/2022 | 232.13 |
WLR3 PSTN + SMPF to SLU MPF without number port (Same/Different CP) | 01/04/2022 | 30/06/2023 | 243.70 |
WLR3 PSTN + SMPF to SLU MPF without number port (Same/Different CP) | 01/07/2023 | 270.80 | |
BT Classic + SMPF to SLU MPF with number export (Same/Different CP) | 20/06/2015 | 31/07/2018 | 168.30 |
BT Classic + SMPF to SLU MPF with number export (Same/Different CP) | 01/08/2018 | 30/09/2019 | 172.91 |
BT Classic + SMPF to SLU MPF with number export (Same/Different CP) | 01/10/2019 | 31/12/2020 | 191.91 |
BT Classic + SMPF to SLU MPF with number export (Same/Different CP) | 01/01/2021 | 31/03/2022 | 232.13 |
BT Classic + SMPF to SLU MPF with number export (Same/Different CP) | 01/04/2022 | 30/06/2023 | 243.70 |
BT Classic + SMPF to SLU MPF with number export (Same/Different CP) | 01/07/2023 | 270.80 | |
BT Classic + GEA-FTTC to SLU MPF with number export (Same/Different CP) | 20/06/2015 | 31/07/2018 | 157.39 |
BT Classic + GEA-FTTC to SLU MPF with number export (Same/Different CP) | 01/08/2018 | 30/09/2019 | 222.72 |
BT Classic + GEA-FTTC to SLU MPF with number export (Same/Different CP) | 01/10/2019 | 31/12/2020 | 230.30 |
BT Classic + GEA-FTTC to SLU MPF with number export (Same/Different CP) | 01/01/2021 | 31/03/2022 | 271.31 |
BT Classic + GEA-FTTC to SLU MPF with number export (Same/Different CP) | 01/04/2022 | 30/06/2023 | 284.90 |
BT Classic + GEA-FTTC to SLU MPF with number export (Same/Different CP) | 01/07/2023 | 316.50 |
Sub Loop Access Tie Cables (100 metre of length only)
Feature | Operative date | Until | Charge £ Exc VAT |
---|---|---|---|
Sub Loop Access Tie Cable Connection 20 pair | 01/03/2008 | 31/07/2015 | 725.60 |
Sub Loop Access Tie Cable Connection 20 pair | 01/08/2015 | 31/07/2018 | 509.23 |
Sub Loop Access Tie Cable Connection 20 pair | 01/08/2018 | 31/07/2019 | 795.59 |
Sub Loop Access Tie Cable Connection 20 pair | 01/08/2019 | 31/10/2020 | 672.12 |
Sub Loop Access Tie Cable Connection 20 pair | 01/11/2020 | 31/03/2022 | 508.30 |
Sub Loop Access Tie Cable Connection 20 pair | 01/04/2022 | 30/06/2023 | 533.70 |
Sub Loop Access Tie Cable Connection 20 pair | 01/07/2023 | 592.90 | |
Sub Loop Access Tie Cable Connection 50 pair | 01/03/2008 | 31/07/2015 | 725.60 |
Sub Loop Access Tie Cable Connection 50 pair | 01/08/2015 | 31/07/2018 | 509.23 |
Sub Loop Access Tie Cable Connection 50 pair | 01/08/2018 | 31/07/2019 | 795.59 |
Sub Loop Access Tie Cable Connection 50 pair | 01/08/2019 | 31/10/2020 | 672.12 |
Sub Loop Access Tie Cable Connection 50 pair | 01/11/2020 | 31/03/2022 | 539.82 |
Sub Loop Access Tie Cable Connection 50 pair | 01/04/2022 | 30/06/2023 | 566.80 |
Sub Loop Access Tie Cable Connection 50 pair | 01/07/2023 | 629.70 | |
Sub Loop Access Tie Cable Connection 100 pair | 01/03/2008 | 31/07/2015 | 765.32 |
Sub Loop Access Tie Cable Connection 100 pair | 01/08/2015 | 31/07/2018 | 545.32 |
Sub Loop Access Tie Cable Connection 100 pair | 01/08/2018 | 31/07/2019 | 1,029.68 |
Sub Loop Access Tie Cable Connection 100 pair | 01/08/2019 | 31/10/2020 | 732.29 |
Sub Loop Access Tie Cable Connection 100 pair | 01/11/2020 | 31/03/2022 | 592.34 |
Sub Loop Access Tie Cable Connection 100 pair | 01/04/2022 | 30/06/2023 | 622.00 |
Sub Loop Access Tie Cable Connection 100 pair | 01/07/2023 | 691.00 | |
Sub Loop Access Tie Cable Rental per annum 20 pair | 01/03/2008 | 31/07/2015 | 27.23 |
Sub Loop Access Tie Cable Rental per annum 20 pair | 01/08/2015 | 31/07/2018 | 27.85 |
Sub Loop Access Tie Cable Rental per annum 20 pair | 01/08/2018 | 31/07/2019 | 30.43 |
Sub Loop Access Tie Cable Rental per annum 20 pair | 01/08/2019 | 31/12/2020 | 29.22 |
Sub Loop Access Tie Cable Rental per annum 20 pair | 01/01/2021 | 31/03/2022 | 30.36 |
Sub Loop Access Tie Cable Rental per annum 20 pair | 01/04/2022 | 30/06/2023 | 30.63 |
Sub Loop Access Tie Cable Rental per annum 20 pair | 01/07/2023 | 34.08 | |
Sub Loop Access Tie Cable Rental per annum 50 pair | 01/03/2008 | 31/07/2015 | 32.68 |
Sub Loop Access Tie Cable Rental per annum 50 pair | 01/08/2015 | 31/07/2018 | 35.37 |
Sub Loop Access Tie Cable Rental per annum 50 pair | 01/08/2018 | 31/07/2019 | 37.75 |
Sub Loop Access Tie Cable Rental per annum 50 pair | 01/08/2019 | 31/12/2020 | 36.45 |
Sub Loop Access Tie Cable Rental per annum 50 pair | 01/01/2021 | 31/03/2022 | 37.20 |
Sub Loop Access Tie Cable Rental per annum 50 pair | 01/04/2022 | 30/06/2023 | 37.53 |
Sub Loop Access Tie Cable Rental per annum 50 pair | 01/07/2023 | 41.64 | |
Sub Loop Access Tie Cable Rental per annum 100 pair | 01/03/2008 | 31/07/2015 | 42.14 |
Sub Loop Access Tie Cable Rental per annum 100 pair | 01/08/2015 | 31/07/2018 | 47.54 |
Sub Loop Access Tie Cable Rental per annum 100 pair | 01/08/2018 | 31/07/2019 | 49.61 |
Sub Loop Access Tie Cable Rental per annum 100 pair | 01/08/2019 | 31/12/2020 | 48.14 |
Sub Loop Access Tie Cable Rental per annum 100 pair | 01/01/2021 | 31/03/2022 | 48.48 |
Sub Loop Access Tie Cable Rental per annum 100 pair | 01/04/2022 | 30/06/2023 | 48.92 |
Sub Loop Access Tie Cable Rental per annum 100 pair | 01/07/2023 | 54.36 | |
Sub Loop Access gifted tie cable connection 20 pair | 01/02/2012 | 31/07/2015 | 510.00 |
Sub Loop Access gifted tie cable connection 20 pair | 01/08/2015 | 31/07/2018 | 460.00 |
Sub Loop Access gifted tie cable connection 20 pair | 01/08/2018 | 30/09/2019 | 500.00 |
Sub Loop Access gifted tie cable connection 20 pair | 01/10/2019 | 31/10/2020 | 560.00 |
Sub Loop Access gifted tie cable connection 20 pair | 01/11/2020 | 31/03/2022 | 342.84 |
Sub Loop Access gifted tie cable connection 20 pair | 01/04/2022 | 30/06/2023 | 360.00 |
Sub Loop Access gifted tie cable connection 20 pair | 01/07/2023 | 400.00 | |
Sub Loop Access gifted tie cable connection 50 pair | 01/02/2012 | 31/07/2015 | 530.00 |
Sub Loop Access gifted tie cable connection 50 pair | 01/08/2015 | 31/07/2018 | 470.00 |
Sub Loop Access gifted tie cable connection 50 pair | 01/08/2018 | 30/09/2019 | 510.00 |
Sub Loop Access gifted tie cable connection 50 pair | 01/10/2019 | 31/10/2020 | 560.00 |
Sub Loop Access gifted tie cable connection 50 pair | 01/11/2020 | 31/03/2022 | 374.36 |
Sub Loop Access gifted tie cable connection 50 pair | 01/04/2022 | 30/06/2023 | 393.10 |
Sub Loop Access gifted tie cable connection 50 pair | 01/07/2023 | 436.70 | |
Sub Loop Access gifted tie cable connection 100 pair | 01/02/2012 | 31/07/2015 | 560.00 |
Sub Loop Access gifted tie cable connection 100 pair | 01/08/2015 | 31/07/2018 | 500.00 |
Sub Loop Access gifted tie cable connection 100 pair | 01/08/2018 | 30/09/2019 | 540.00 |
Sub Loop Access gifted tie cable connection 100 pair | 01/10/2019 | 31/10/2020 | 630.00 |
Sub Loop Access gifted tie cable connection 100 pair | 01/11/2020 | 31/03/2022 | 426.88 |
Sub Loop Access gifted tie cable connection 100 pair | 01/04/2022 | 30/06/2023 | 448.20 |
Sub Loop Access gifted tie cable connection 100 pair | 01/07/2023 | 498.00 | |
Sub Loop Access gifted tie cable rental per annum 20 pair | 01/02/2012 | 31/07/2015 | 21.24 |
Sub Loop Access gifted tie cable rental per annum 20 pair | 01/08/2015 | 31/07/2018 | 20.20 |
Sub Loop Access gifted tie cable rental per annum 20 pair | 01/08/2018 | 30/09/2019 | 21.05 |
Sub Loop Access gifted tie cable rental per annum 20 pair | 01/10/2019 | 31/12/2020 | 22.00 |
Sub Loop Access gifted tie cable rental per annum 20 pair | 01/01/2021 | 31/03/2022 | 23.40 |
Sub Loop Access gifted tie cable rental per annum 20 pair | 01/04/2022 | 30/06/2023 | 23.61 |
Sub Loop Access gifted tie cable rental per annum 20 pair | 01/07/2023 | 26.28 | |
Sub Loop Access gifted tie cable rental per annum 50 pair | 01/02/2012 | 31/07/2015 | 21.24 |
Sub Loop Access gifted tie cable rental per annum 50 pair | 01/08/2015 | 31/07/2018 | 20.20 |
Sub Loop Access gifted tie cable rental per annum 50 pair | 01/08/2018 | 30/09/2019 | 21.05 |
Sub Loop Access gifted tie cable rental per annum 50 pair | 01/10/2019 | 31/12/2020 | 22.00 |
Sub Loop Access gifted tie cable rental per annum 50 pair | 01/01/2021 | 31/03/2022 | 23.40 |
Sub Loop Access gifted tie cable rental per annum 50 pair | 01/04/2022 | 30/06/2023 | 23.61 |
Sub Loop Access gifted tie cable rental per annum 50 pair | 01/07/2023 | 26.28 | |
Sub Loop Access gifted tie cable rental per annum 100 pair | 01/02/2012 | 31/07/2015 | 21.24 |
Sub Loop Access gifted tie cable rental per annum 100 pair | 01/08/2015 | 31/07/2018 | 20.20 |
Sub Loop Access gifted tie cable rental per annum 100 pair | 01/08/2018 | 30/09/2019 | 21.05 |
Sub Loop Access gifted tie cable rental per annum 100 pair | 01/10/2019 | 31/12/2020 | 22.00 |
Sub Loop Access gifted tie cable rental per annum 100 pair | 01/01/2021 | 31/03/2022 | 23.40 |
Sub Loop Access gifted tie cable rental per annum 100 pair | 01/04/2022 | 30/06/2023 | 23.61 |
Sub Loop Access gifted tie cable rental per annum 100 pair | 01/07/2023 | 26.28 | |
Sub Loop Access Plan and Build Abortive Visit Charge | 01/02/2012 | 31/07/2013 | 85.00 |
Sub Loop Access Plan and Build Abortive Visit Charge | 01/08/2013 | 31/07/2019 | 90.00 |
Sub Loop Access Plan and Build Abortive Visit Charge | 01/08/2019 | 31/10/2020 | 70.00 |
Sub Loop Access Plan and Build Abortive Visit Charge | 01/11/2020 | 30/06/2023 | 67.50 |
Sub Loop Access Plan and Build Abortive Visit Charge | 01/07/2023 | 70.00 | |
Sub Loop Access Plan and Build Cease Tie Cable Charge (up to 2 Tie cables) | 01/03/2014 | 31/05/2020 | 700.00 |
Sub Loop Access Plan and Build Cease Tie Cable Charge (2 Tie cables) | 01/06/2020 | 31/03/2022 | 769.00 |
Sub Loop Access Plan and Build Cease Tie Cable Charge (2 Tie cables) | 01/04/2022 | 30/06/2023 | 460.00 |
Sub Loop Access Plan and Build Cease Tie Cable Charge (2 Tie cables) | 01/07/2023 | 31/05/2024 | 497.00 |
Sub Loop Access Plan and Build Cease Tie Cable Charge (2 Tie cables) | 01/06/2024 | 522.00 | |
Sub Loop Access Plan and Build Cease Tie Cable Charge (per Tie cable) | 01/06/2020 | 31/03/2022 | 534.00 |
Sub Loop Access Plan and Build Cease Tie Cable Charge (per Tie cable) | 01/04/2022 | 30/06/2023 | 320.00 |
Sub Loop Access Plan and Build Cease Tie Cable Charge (per Tie cable) | 01/07/2023 | 31/05/2024 | 346.00 |
Sub Loop Access Plan and Build Cease Tie Cable Charge (per Tie cable) | 01/06/2024 | 363.00 | |
Sub Loop Access Plan and Build Cease Gifted Tie Cable Charge (2 Tie cables) | 01/06/2020 | 31/03/2022 | 661.00 |
Sub Loop Access Plan and Build Cease Gifted Tie Cable Charge (2 Tie cables) | 01/04/2022 | 30/06/2023 | 400.00 |
Sub Loop Access Plan and Build Cease Gifted Tie Cable Charge (2 Tie cables) | 01/07/2023 | 31/05/2024 | 432.00 |
Sub Loop Access Plan and Build Cease Gifted Tie Cable Charge (2 Tie cables) | 01/06/2024 | 454.00 | |
Sub Loop Access Plan and Build Cease Gifted Tie Cable Charge (per Tie cable) | 01/06/2020 | 31/03/2022 | 480.00 |
Sub Loop Access Plan and Build Cease Gifted Tie Cable Charge (per Tie cable) | 01/04/2022 | 30/06/2023 | 290.00 |
Sub Loop Access Plan and Build Cease Gifted Tie Cable Charge (per Tie cable) | 01/07/2023 | 31/05/2024 | 313.00 |
Sub Loop Access Plan and Build Cease Gifted Tie Cable Charge (per Tie cable) | 01/06/2024 | 329.00 |
An early cancellation fee applies to all SLU Access Tie Cables. The table below explains the relevant fee payable to Openreach for the year in which the SLU Access Tie Cable is cancelled..
Feature | Note | |||||||
---|---|---|---|---|---|---|---|---|
Year | 1st | 2nd | 3rd | 4th | 5th | 6th | 7th | Note 4 |
Fee (£) | 7 x annual rental | 6.5 x annual rental | 6 x annual rental | 5.5 x annual rental | 5 x annual rental | 4.5 x annual rental | 4 x annual rental | Note 4 |
Year | 8th | 9th | 10th | 11th | 12th | 13th | 14th | Note 4 |
Fee (£) | 3.5 x annual rental | 3 x annual rental | 2.5 x annual rental | 2 x annual rental | 1.5 x annual rental | 1 x annual rental | 0.5 x annual rental | Note 4 |
A number of prices relevant to SLU are available in the Service Products Pricing section of the Openreach price list available at: http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
Feature | |
---|---|
Time Related Charges | Additional charges may be raised where non-standard work is required that is not included in standard prices |
NTE Shifts | Charges for Shifts are in the Time Related Charges price page. These charges will appear on customer bills differently depending on the associated product. E.g. for SLU: Standard NTE Shift and Additional NTE Shift |
Abortive Visit Charges | Where a Communication Provider has agreed an appointment with BT for work at the End Users' site in connection with the Communication Provider service, if BT is unable to carry out the work at, or gain access to, such End User site or the appointment is broken (unless due to BT's error). |
Excess Construction Charges | Charges for network infrastructure over and above standard requirements are charged as excess construction. These charges include work on internal trunking & traywork; breaking through walls; additional poles, ducts and cables; radio charges and miscellaneous non-standard or specially requested items. These charges may also apply for cancellations placed after the appropriate time (point of no return). |
Notes:
1) Orders placed and cancelled before completing a Full Survey will incurr a cancellation charge. On completion of a Full Survey the survey charge will always apply.
2) Charges for Sub-Loop PCP Extension Works will apply whenever a Full Survey identifies existing space is exhausted. The price will cover the replacement of the cabinet fabric only. Additional work, if required to facilitate the fabric change or to enable the installation of Sub Loop tie cables will be charged on a bespoke basis.
3) If a Communication Provider reports a fault and requests a field visit to complete further diagnostic tests over and above a standard line test (when available) and the fault diagnosis proves it to be the responsibility of the Communication Provider's (equipment), visit charges or TRC will be applied, which can be found under Service Products section: http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
4) An early cancellation fee applies to all SLU Access Tie Cables. The table explains the relevant fee payable to Openreach for the year in which the SLU Access Tie Cable is cancelled.
5) The Expedite charge is payable in addition to the SLU connection charge. The charge is only raised if the revised Customer Committed Date is met.
6) Cancellation charges are compensatory and not subject to VAT
7) We do not offer Break-In at other jointing chambers such as manholes