ISDN30 (I.421) is not available.
Service will be interrupted for all conversions, reconfigurations, renumbers, shifts and premises moves.
Feature | Note | Operative date | Until | Connection Charge per Installation £ Exc VAT | Connection Charge per Channel £ Exc VAT | Connection Charge per Block of Channels £ Exc VAT |
---|---|---|---|---|---|---|
For Wholesale ISDN30 with or without DDI Capability | ||||||
New Installation Charge (Charged once per end user on a single installation basis) (Charged where suitable spare 'BT' 2Mb digital line plant does not exist at the end user's address). | Note 3 | 01/07/2003 | 10/05/2012 | 550.00 | ||
New Installation Charge (Charged once per end user on a single installation basis) (Charged where suitable spare 'BT' 2Mb digital line plant does not exist at the end user's address). | Note 3 | 11/05/2012 | 31/03/2013 | 865.00 | ||
New Installation Charge (Charged once per end user on a single installation basis) (Charged where suitable spare 'BT' 2Mb digital line plant does not exist at the end user's address). | Note 3 | 01/04/2013 | 31/07/2013 | 900.00 | ||
New Installation Charge (Charged once per end user on a single installation basis) (Charged where suitable spare 'BT' 2Mb digital line plant does not exist at the end user's address). | Note 3 | 01/08/2013 | 30/04/2021 | 755.00 | ||
New Installation Charge (Charged once per end user on a single installation basis) (Charged where suitable spare 'BT' 2Mb digital line plant does not exist at the end user's address). | Note 3 | 01/05/2021 | 31/03/2022 | 792.75 | ||
New Installation Charge (Charged once per end user on a single installation basis) (Charged where suitable spare 'BT' 2Mb digital line plant does not exist at the end user's address). | Note 3 | 01/04/2022 | 31/03/2023 | 848.25 | ||
New Installation Charge (Charged once per end user on a single installation basis) (Charged where suitable spare 'BT' 2Mb digital line plant does not exist at the end user's address). | Note 3 | 01/04/2023 | 31/03/2024 | 1,060.32 | ||
New Installation Charge (Charged once per end user on a single installation basis) (Charged where suitable spare 'BT' 2Mb digital line plant does not exist at the end user's address). | Note 3 | 01/04/2024 | 31/03/2025 | 1,109.10 | ||
New Installation Charge (Charged once per end user on a single installation basis) (Charged where suitable spare 'BT' 2Mb digital line plant does not exist at the end user's address). | Note 3 | 01/04/2025 | 1134.61 | |||
Installation per Channel (Minimum 8 channels) at the End User Premises (on a single installation basis) | Note 3 | 01/07/2003 | 10/05/2012 | 30.00 | ||
Installation per Channel (Minimum 8 channels) at the End User Premises (on a single installation basis) | Note 3 | 11/05/2012 | 31/03/2013 | 6.50 | ||
Installation per Channel (Minimum 8 channels) at the End User Premises (on a single installation basis) | Note 3 | 01/04/2013 | 31/07/2013 | 5.50 | ||
Installation per Channel (Minimum 8 channels) at the End User Premises (on a single installation basis) | Note 3 | 01/08/2013 | 30/04/2021 | 3.50 | ||
Installation per Channel (Minimum 8 channels) at the End User Premises (on a single installation basis) | Note 3 | 01/05/2021 | 31/03/2022 | 3.68 | ||
Installation per Channel (Minimum 8 channels) at the End User Premises (on a single installation basis) | Note 3 | 01/04/2022 | 31/03/2023 | 3.94 | ||
Installation per Channel (Minimum 8 channels) at the End User Premises (on a single installation basis) | Note 3 | 01/04/2023 | 31/03/2024 | 4.93 | ||
Installation per Channel (Minimum 8 channels) at the End User Premises (on a single installation basis) | Note 3 | 01/04/2024 | 31/03/2025 | 5.16 | ||
Installation per Channel (Minimum 8 channels) at the End User Premises (on a single installation basis) | Note 3 | 01/04/2025 | 5.28 | |||
ALTERNATIVELY for installation of channels other than the first 15 and where suitable spare `BT' 2Mb digital line plant exists | Note 2 | |||||
A Block of 2 or more channels can be taken at: | Note 2 | 05/06/2006 | 04/02/2009 | 60.00 | ||
A Block of 2 or more channels can be taken at: | Note 2 | 05/02/2009 | Withdrawn |
Normal internal wiring charges will be raised if the Communications Provider requires Openreach to connect the Network terminating point to the end user's premises equipment. TRC charges will apply.
The Wholesale ISDN30 service has a minimum threshold of 8 channels per End-user per single site location. Transfer of DASS installations originally provided before March 1997 of fewer channels is allowed, however, no reductions of channels below 8 will be allowed. It is not permissible to have more than one Customer or End user sharing a Wholesale ISDN30 service.
In multi tenanted buildings, it will be considered that each end user has `new premises' and the fact that 2Mb line plant is to the building does not entitle them to reduced charges.
Premises moves will always be considered as a new installation and full connection charges will apply.
A customer installation can have both DDI and non-DDI channels. Once a channel has been initially provided it can be changed from a DDI channel to a non-DDI channel by reconfiguration of the channel which will involve a reconfiguration charge.
Calling Features applied to ISDN30e installations apply to all channels. If different configurations are required for some channels, e.g. Some Incoming only and some Outgoing only channels, these will be provided in a separate installation. New installation prices will apply.
Transfer charge for same day transfer where no changes are being made to the original installation, i.e. where no internal or external wiring is required and all equipment is in place.
Feature | Note | Operative date | Until | Connection Charge per 30 Channel Access Bearer Per Bearer £ Exc VAT |
---|---|---|---|---|
For Wholesale ISDN30e and ISDN30 DASS with or without DDI Capability Same Day Transfer. | Note 1 | 11/05/2005 | 10/05/2012 | 75.00 |
For Wholesale ISDN30e and ISDN30 DASS with or without DDI Capability Same Day Transfer. | Note 1 | 11/05/2012 | 31/03/2013 | 79.05 |
For Wholesale ISDN30e and ISDN30 DASS with or without DDI Capability Same Day Transfer. | Note 1 | 01/04/2013 | 30/04/2021 | 81.57 |
For Wholesale ISDN30e and ISDN30 DASS with or without DDI Capability Same Day Transfer. | Note 1 | 01/05/2021 | 31/03/2022 | 84.02 |
For Wholesale ISDN30e and ISDN30 DASS with or without DDI Capability Same Day Transfer. | Note 1 | 01/04/2022 | 31/03/2023 | 89.91 |
For Wholesale ISDN30e and ISDN30 DASS with or without DDI Capability Same Day Transfer. | Note 1 | 01/04/2023 | 31/03/2024 | 112.39 |
For Wholesale ISDN30e and ISDN30 DASS with or without DDI Capability Same Day Transfer. | Note 1 | 01/04/2024 | 31/03/2025 | 117.56 |
For Wholesale ISDN30e and ISDN30 DASS with or without DDI Capability Same Day Transfer. | Note 1 | 01/04/2025 | 120.27 |
Where service is taken over when it is not on the same day as the end of the previous customer service then full connection charges apply.
Transfers are required when a SP takes over the customer base of another SP. The Line Transfer price will be charged for each line to be transferred.
Feature | Operative date | Until | Charge per Installation £ Exc VAT |
---|---|---|---|
Pre-validation of Transfer Order for Wholesale ISDN30 installation types - WLR2 only | 24/04/2006 | 30/04/2008 | 4.90 |
Pre-validation of Transfer Order for Wholesale ISDN30 installation types - WLR2 only | 01/05/2008 | 31/07/2018 | 3.50 |
Pre-validation of Transfer Order for Wholesale ISDN30 installation types - WLR2 only | 01/08/2018 | withdrawn |
A number of prices relevant to WLR are available in the Service Products Pricing section of the Openreach price list available at: http://www.openreach.co.uk/orpg/pricing/serviceproducts.do
Feature | |
---|---|
Repair Service Levels | Enhanced repair options |
Time Related Charges | Additional charges may be raised where non-standard work is required that is not included in standard prices |
Abortive Visit Charges | Where a Communication Provider has agreed an appointment with BT for work at the End Users' site in connection with the Communication Provider service, if BT is unable to carry out the work at, or gain access to, such End User site or the appointment is broken (unless due to BT's error) |
Excess Construction Charges | Charges for network infrastructure over and above standard requirements are charged as excess construction. These charges include work on internal trunking & traywork; breaking through walls; additional poles, ducts and cables; radio charges and miscellaneous non-standard or specially requested items. These charges may also apply for cancellations placed after the appropriate time (point of no return). |
Notes:
1) This product relates to where an incoming end user or Communications Provider takes over service at a site where it already exists (no new external wiring is provided) and where there is no break in service. This transfer must take place on the same calendar day. Where there is a delay between one customer ending service and a new customer requiring service, i.e. not on the same day, the new customer will be charged as a New Connection.
2) This price is payable per order for channels ordered in one transaction and not available for customers within 4 months of the Bring Into Service date of a previous new provision order, which includes channels added as part of a transfer order. Any orders placed within this time will be charged at the normal connection rate.
3) If the CP requests the ISDN30 is provided using fibre only Excess Construction Charges will be applicable and the ECC Survey Charge will be raised in all cases detailed at:
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do