Skip to page contents
Openreach


MPF and SMPF Product Information (EMP)

Metallic Path Facilities (MPF)

MPF and SMPF Strategic (EMP) Product Information

Type NameSize Issue date
Openreach Consolidated Product Roadmap

The Openreach Consolidated Product Roadmap covers various Openreach products including Service Products, WLR, LLU, and Ethernet, Cablelink and TDM related Products

201 K 11/02/2008
MPF/SMPF Product Description

EMP - MPF/SMPF Product Description Issue 3.3

788 K 06/03/2008
End to End Process Manual

EMP - End to End Process Manual Issue 3.1

2.6 M 21/12/2007
Bulk Migrations Code of Practice

Bulk Migrations Code of Practice Issue 1.0

271 K 11/03/2008
Project Managed Migration Product Manual

EMP - Project Managed Migration Product Manual Issue Draft V1.1

246 K 31/08/2006
Published Incompatibility List (EMP Version)

Published Incompatibility List (EMP Version) Issue 1_ Version 2

55 K 11/02/2008
Enhanced Care Plus on Demand

Enhanced Care Plus on Demand Issue 1.2

333 K 30/06/2006
Product Description for LLU (MPF & SMPF) Re-termination

Product Description for LLU (MPF & SMPF) Re-termination Issue 1

138 K 18/12/2006
Product Description for LLU MPF & SMPF Expedite (for new provision orders)

Product Description for LLU MPF & SMPF Expedite (for new provision orders) Issue Draft 0B

134 K 18/12/2006
Product Description for MPF Enhanced Provision

Product Description for MPF Enhanced Provision Issue 1.4

53 K 09/05/2007

MPF Tactical (eCo) Product Information

Type NameSize Issue date
Product Description for Fully Unbundled Metallic Path Facility (MPF)

Product Description for Fully Unbundled Metallic Path Facility (MPF) Issue 4.7

122 K 22/02/2007
List of Thamesway exchanges relating to MPF Enhanced Provision (new orders)

List of Thamesway exchanges relating to MPF Enhanced Provision (new orders)

43 K 20/02/2007
List of London exchanges relating to MPF Enhanced Provision (new orders)

List of London exchanges relating to MPF Enhanced Provision (new orders)

18 K 20/02/2007

MPF Files Temporarily Removed

Fully Unbundled Metallic Path Facility (MPF) End to End Process Manual

 

Product Description & User Guide Copper Quality A46

 

These documents have been temporarily removed whilst the contents are reviewed and updated. The updated and refreshed documents will shortly be reloaded. In the meantime, please contact pearl.tawiah@openreach.co.uk for further information.

Shared Metallic Path Facility (SMPF)

Shared Metallic Path Facility (SMPF), Line Sharing or ‘shared access to the local loop’ provides access to the non-voice frequency spectrum of a metallic path over which analogue telephone service is being provided to the end-user by BT allowing a CP to deploy technologies.

Shared Metallic Path Facilities (SMPF)

SMPF Tactical - line Share Automation (LiSA)

Type NameSize Issue date
Product Description for Line Sharing Metallic Path Facility (SMPF)

Product Description for Line Sharing Metallic Path Facility (SMPF) Issue 4.1draft0b

172 K 09/01/2007
LLU Line Checker Product Description & User Guide

LLU Line Checker Product Description & User Guide Issue 4

202 K 31/05/2006
LLU Bulk Line Checker Product Description & User Guide

LLU Bulk Line Checker Product Description & User Guide Issue 1b

259 K 08/05/2006
LLU Bulk Line Checker Terms and Conditions

LLU Bulk Line Checker Terms and Conditions Issue 1

75 K 13/09/2006
BT LiSA End to End Process Flow Diagrams

BT LiSA End to End Process Flow Diagrams Issue 4

5.7 M 07/09/2006
LiSA (Line Share Automation) Response Codes

LiSA (Line Share Automation) Response Codes Issue 6.9

86 K 09/01/2007
LiSA XML Responses

LiSA XML Responses Issue 1.1

263 K 03/01/2007
LiSA External Test System Userguide

LiSA External Test System Userguide Issue 1.4

466 K 15/02/2007
User Guide Line Share Automation (LiSA) XML

User Guide Line Share Automation (LiSA) XML Issue 2.1

281 K 24/08/2006

SMPF Files Temporarily Removed

Technical Specification for Line Sharing Metallic Path Facility (SMPF)

Line Sharing Metallic Path Facility (SMPF) End to End Process Manual

Bulk Migration Process Interface Document

 

These documents have been temporarily removed whilst the contents are reviewed and updated. The updated and refreshed documents will shortly be reloaded. In the meantime, please contact pearl.tawiah@openreach.co.uk for further information.