Skip to page contents
Openreach


Installation diagrams

This page includes all of the information and construction details required to lay duct, build jointing chambers and provide cables into and in the property.
Type NameSize Issue date
Joint Box JBF102

402 K 26/10/2009
Joint Box JBF104

442 K 26/10/2009
Joint Box JBF106

501 K 26/10/2009
Joint Box JBF110

531 K 26/10/2009
Joint Box JBF111

507 K 26/10/2009
Pre-formed chamber system - Quadbox's

312 K 22/01/2009
External Network Terminating Equipment (NTE)

1.9 M 22/01/2009
Builders Guide Issue 3

962 K 08/10/2009