Export to Excel

Price list

Product line:
Super-fast Fibre Access
First level product:
Fibre to the Cabinet (FTTC)
Second level product:
Generic Ethernet Access (FTTC)
Version:
N/A
Openreach

Generic Ethernet Access (FTTC)


Generic Ethernet Access Connection and Rental Charges - All Product Variants

 Special Offers are available and can be found using the Special Offer link on the main price list page. 

  • This can be found at: http://www.openreach.co.uk/orpg/home/products/pricing/loadPricing.do
  • Select Section 8 Special Offers
  • Scroll down the page and all Super Fast Access Special Offer prices can be found in Section 8.4

Feature Note Operative date Until Connection
£ Exc VAT
Annual Rental
£ Exc VAT
Up to 40Mbit/s downstream and up to 2Mbit/s upstream (including Simultaneous Provide) note 1 01/07/2009 31/08/2011 75.00 82.80
Up to 40Mbit/s downstream and up to 2Mbit/s upstream (including Simultaneous Provide) note 1 01/09/2011 31/03/2013 80.00 82.80
Up to 40Mbit/s downstream and up to 2Mbit/s upstream (including Simultaneous Provide) Note 1 and Note 6 01/04/2013 92.00 82.80
Up to 40Mbit/s / increased Upstream beyond 2Mbit/s up to 10Mbit/s (including Simultaneous Provide) note 1 23/11/2009 31/08/2011 75.00 88.80
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) note 1 01/09/2011 31/03/2013 80.00 88.80
Up to 40Mbit/s downstream and up to 10Mbit/s upstream (including Simultaneous Provide) Note 1 and Note 6 01/04/2013 92.00 88.80
Up to 40Mbit/s / increased Upstream beyond 10Mbit/s up to 15Mbit/s (including Simultaneous Provide) note 1 30/09/2010 31/08/2011 75.00 119.40
Up to 80Mbit/s downstream and up to 20Mbit/s upstream (including Simultaneous Provide) note 1 10/04/2012 31/03/2013 80.00 119.40
Up to 80Mbit/s downstream and up to 20Mbit/s upstream (including Simultaneous Provide) Note 1 and Note 6 01/04/2013 92.00 119.40
GEA Cablelink (provides access to the Fibre-enabled customer base) 01/07/2009 2000.00 0.00

Transaction charges
Feature Note Operative date Until Special Offers Available Connection
£ Exc VAT
CP-CP GEA Migration - same product/premise 01/07/2009 50.00
Uplift charge from Up to 40Mbit/s / 2Mbit/s product to Up to 40Mbit/s / increased Upstream beyond 2Mbit/s up to 10Mbit/s 01/07/2009 29/09/2010 10.00
Uplift charge from Up to 40Mbit/s / 2Mbit/s product to Up to 40Mbit/s / increased Upstream beyond 2Mbit/s up to 10Mbit/s 30/09/2010 10.00
Uplift charge from Up to 40Mbit/s /10Mbit/s product to Up to 40Mbit/s / increased Upstream beyond 10Mbit/s up to 15Mbit/s 30/09/2010 31/08/2011 10.00
Uplift charge from Up to 40Mbit/s downstream and up to 2Mbit/s product to Up to 80Mbit/s downstream and up to 20Mbit/s upstream 10/04/2012 Special Offer available -see Section 8.4 10.00
Uplift charge from Up to 40Mbit/s downstream and up to 10Mbit/s product to Up to 80Mbit/s downstream and up to 20Mbit/s upstream 10/04/2012 Special Offer available -see Section 8.4 10.00
Customer Premises Equipment Replacement - Replacement of damaged VDSL Modem 01/07/2009 26.00
Service cessation (any product variant) 01/07/2009 23/04/2010 4.90
Service cessation (any product variant) 24/04/2010 31/03/2011 5.22
Service cessation (any product variant) 01/04/2011 5.37
Managed Installation
Price per module 02/07/2009 31/08/2011 12.00
Price per module 01/09/2011 12.50
Base Module, CP Router & 1 PC (2 modules) 02/07/2009 31/08/2011 24.00
Base Module, CP Router & 1 PC (2 modules) 01/09/2011 25.00
Set Top Box Reconnection (2 modules) 02/07/2009 31/08/2011 24.00
Set Top Box Reconnection (2 modules) 01/09/2011 31/03/2013 25.00
Set Top Box Reconnection (1 module) 01/04/2013 12.50
Reconnection of end user devices (Price per module, each device to be assigned N number of modules) 02/07/2009 31/08/2011 12.00
Reconnection of end user devices (Price per module, each device to be assigned N number of modules) 01/09/2011 12.50
Home Wiring Solution 03/08/2010 31/08/2011 TBC
Home Wiring Solution note 4 01/09/2011 0.00
Service Modification Charges
NTE Shift - Relocation of existing NTE 01/07/2009 See Service Products Price List - see link below
Cancel/Amend/Modify - CRD Amend,order notes amend, order cancellation, Care Level, etc. 01/07/2009 10.00
Cancel/Amend/Modify - Regrading of existing upstream or downstream speed, both at point of sale and in-life etc. 01/07/2009 10.00
VLAN moves applied to GEA Cablelink Modify transactions 22/11/2011 15.00
Product Assurance Charges
Super Fast Visit Assure - Visit to customer premises note 2 01/07/2009 16/07/2011 0.00
Super Fast Visit Assure - Visit to customer premises 17/07/2011 31/03/2013 155.00
Visit Assure - Visit to customer premises 01/04/2013 165.00
Right When Tested
Right When Tested - Charge for submitting a trouble ticket proved RWT via the SMC 01/07/2009 See LLU Price list - MPF Standard Line Test - see link below
Right When Tested - Charge for clearing a trouble ticket proved RWT in the Network 01/07/2009 See LLU Price list - Network RWT - see link below
Appointment Charges
FTTC Expedite note 3 01/07/2010 31/10/2011 158.40
FTTC Expedite note 3 01/11/2011 31/03/2013 180.00
Point of Sale FTTC Expedite note 3 01/11/2011 31/03/2013 180.00
GEA-FTTC Expedite / Point of Sale GEA-FTTC Expedite note 3 01/04/2013 196.00
Flexible Appointments See Service Products Price List
Bulk Checker Charges
Bulk Line Checker (per file) 29/06/2010 17/09/2012 777.60
Bulk Line Checker (per file) 18/09/2012 850.58

Generic Ethernet Access - Homemovers adjustment
Feature Note Operative date Percentage adjustment
Fibre to the Cabinet Held to Term charges note 5 01/09/2011 9%

Notes:

Note 1: A Simultaneous Provide is where the service is provided as part of a new copper line provision on either MPF or WLR with the same CCD as a new provision of the GEA FTTC Product. The prices shown here refer to the the GEA FTTC element of that provide only.

Note 2 : These products are free of charge at launch but prices will be notified in the future

Note 3: The Expedite charge is payable in addition to the FTTC connection charge. The charge is only raised if the revised Customer Committed Date is met.

Note 4: This is not offered as a discrete product but instead is part of connection

Note 5: Hold to Term Charges become due when a Service is ceased before the expiry of any minimum term for that Service. The minimum term period for Fibre to the Cabinet and Fibre to the Premises products are 12 months.  The rebate on Hold to Term charges set out here is payable one month in arrears on a Communication Providers total Hold to Term charges payable in the previous month. It will be shown on the bill separately.
The percentage is based on data from the Office of National Statistics, Property Transactions report and will be refreshed annually in March.

 Note 6:  Unless otherwise specified, the connection charge specified relates to Engineer Installation including Openreach modem.  For more information about other installation variants, refer to the Trial Indicative Price List for the GEA-FTTC PCP Only Pilot.

NTE Shift - can be found at:  http://www.openreach.co.uk/orpg/pricing/serviceproducts.do

MPF Standard Line  and Network RWT can be found at the  LLU Price List: http://www.openreach.co.uk/orpg/pricing/lluprices.do

Repair Service Levels

Details can be found under the Service Products section of the price list, that can be found at:

http://www.openreach.co.uk/orpg/pricing/serviceproducts.do

Other Charges

Time Related Charges

For Time Related Charges (applicable to Out of Hours Visits, Abortive Visits, Equipment Testing, etc.) refer to the Service Products section of the price list, that can be found at: 

http://www.openreach.co.uk/orpg/pricing/serviceproducts.do



   Back to top
British Telecommunications plc
Registered office:
81 Newgate Street
London EC1A 7AJ
Registered in England and Wales No. 1800000
www.openreach.co.uk