Export to Excel

Price list

Product line:
Service Product Pricing
First level product:
Common products (Subject to applicable LLU/WLR/Ethernet/GEA Product Agreements)
Second level product:
Time Related Charges (Including Shifts)
Version:
N/A
Openreach

Time Related Charges (Including Shifts)


All Work
Feature Operative date Until Normal Working Day
£ Exc VAT
All other times except Sundays and Public / Bank Holidays
£ Exc VAT
Sundays and Public/ Bank Holidays
£ Exc VAT
Standard Chargeable Visit (Visit plus up to 1 hours work) 17/10/2009 07/06/2012 105.00 130.00 150.00
Standard Chargeable Visit (Visit plus up to 1 hours work) 08/06/2012 31/03/2013 115.00 143.50 172.00
Standard Chargeable Visit (Visit plus up to 1 hours work) 01/04/2013 120.00 150.00 180.00
Additional Hours (or Part thereof) 11/10/2006 31/03/2011 55.00 85.00 100.00
Additional Hours (or Part thereof) 01/04/2011 07/06/2012 50.00 85.00 100.00
Additional Hours (or Part thereof) 08/06/2012 31/03/2013 57.00 85.50 114.00
Additional Hours (or Part thereof) 01/04/2013 60.00 90.00 120.00
Supplementary charges (Per Visit) To carry out work outside normal working hours, where work during normal hours is included within the normal price (eg line connection charges). This can only be used in conjunction with a request involving normal list prices or contracted work and is in addition to these charges 11/10/2006 07/06/2012 NA 25.00 45.00
Supplementary charges (Per Visit) To carry out work outside normal working hours, where work during normal hours is included within the normal price (eg line connection charges). This can only be used in conjunction with a request involving normal list prices or contracted work and is in addition to these charges 08/06/2012 31/03/2013 NA 28.50 57.00
Supplementary charges (Per Visit) To carry out work outside normal working hours, where work during normal hours is included within the normal price (eg line connection charges). This can only be used in conjunction with a request involving normal list prices or contracted work and is in addition to these charges 01/04/2013 NA 30.00 60.00
Supplementary charges (Per Hour or Part thereof) 11/10/2006 31/03/2011 NA 30.00 45.00
Supplementary charges (Per Hour or Part thereof) 01/04/2011 07/06/2012 NA 35.00 50.00
Supplementary charges (Per Hour or Part thereof) 08/06/2012 31/03/2013 NA 28.50 57.00
Supplementary charges (Per Hour or Part thereof) 01/04/2013 NA 30.00 60.00

The Standard Chargeable Visit will be charged for the following:

  • Repairing faults where this work is not covered under the terms of a service contract with Openreach
  • Providing or rearranging services where standard Openreach charges are not available.
  • Internal and External Shifts.
  • A fault is found not to be with any Openreach service or equipment. In particular this covers the situation where no fault is found, or the fault is found to be on non-Openreach equipment, or is due to damage caused by someone at the customer's or end user's premises, or due to theft, loss or removal of equipment, or in the case of customer or end user owned or rented equipment (but not Openreach's network) faults caused by external or environmental factors (eg lightning, electrical surges or floods).  

Non Standard items will be charged on a per occasion basis.

Time Related Charges also may apply where work is done outside of the times of the customers maintenance agreement or for provision outside the times of a normal working day.


Standard Stores Items

Standard Stores Items (These items cannot be ordered separately and will only be supplied as part of other installation or maintenance work as deemed appropriate by Openreach.)

Feature Operative date Until Standard Stores Items
£ Exc VAT
Internal Pack (For internal work at a normal premises) 11/10/2006 07/06/2012 5.88
Internal Pack (For internal work at a normal premises) 08/06/2012 31/03/2013 6.40
Internal Pack (For internal work at a normal premises) 01/04/2013 6.70
External Pack (For external work at a normal premises) 11/10/2006 07/06/2016 13.70
External Pack (For external work at a normal premises) 08/06/2012 31/03/2013 14.90
External Pack (For external work at a normal premises) 01/04/2013 15.60
Data ext kit (Associated with Broadband Health check) 11/10/2006 07/06/2012 6.61
Data ext kit (Associated with Broadband Health check) 08/06/2012 31/03/2013 7.20
Data ext kit (Associated with Broadband Health check) 01/04/2013 7.60
SSFP NTE2000 (Broadband front plate) 11/10/2006 07/06/2012 5.83
SSFP NTE2000 (Broadband front plate) 08/06/2012 31/03/2013 6.40
SSFP NTE2000 (Broadband front plate) 01/04/2013 6.70
Broadband micro filter 11/10/2006 07/06/2012 5.13
Broadband micro filter 08/06/2012 31/03/2013 5.60
Broadband micro filter 01/04/2013 5.90
NTE8 (For ISDN2 use) 11/10/2006 07/06/2012 14.62
NTE8 (For ISDN2 use) 08/06/2012 31/03/2013 15.90
NTE8 (For ISDN2 use) 01/04/2013 16.60
Block Terminal 92A (For Redcare use) 11/10/2006 07/06/2012 1.24
Block Terminal 92A (For Redcare use) 08/06/2012 31/03/2013 1.40
Block Terminal 92A (For Redcare use) 01/04/2013 1.50

Items of small stores will be charged separately, utilising the standard stores where appropriate.  Non Standard items will be charged on a per occasion basis.


Internal NTE Shifts or External Shift or Rearrangement Of Line-plant from the Distribution Point

Note: Time Related Charges rates will apply for shifts of Ethernet circuits.

Feature Operative date Until Charge
£ Exc VAT
Internal and External Shifts 08/06/2012 31/03/2013 115.00
Internal and External Shifts 01/04/2013 120.00
Additional Line shifted 08/06/2012 31/03/2013 57.00
Additional Line shifted 01/04/2013 60.00

These charges will appear on customer bills differently depending on the associated product.

e.g. For WLR:    WLR Visit Charge                 £60         WLR Per Line Shifted                £60
      For LLU:     LLU Standard NTE Shift         £120        LLU Additional NTE Shift           £60
      For External Shifts:   Shift or reposition external overhead wires to same building  £120     

If the Openreach engineer is already visiting the premises to carry out other work, or shifting a second or subsequent NTE or rearranging the line from the Distribution Point, customers will be charged using the "Additional Line Shifted price" for each line shifted. This charge includes any stores requirements.

If the order is split between two buildings on one site, the work is treated as two jobs but only one incurs the "Internal and External Shifts" price, whilst the second is charged at the "Additional Line shifted" price.  If the order is split between two sites, then two "Internal and External Shifts" apply.

The External Shift or Rearrangement of Line-plant covers the external  wiring from the distribution point to the protection box (or where one would be fitted) at the End User's premises, and the internal wiring from the protection box up to and including the first (main) socket, block terminal or other network terminating point.

Requests to shift an exchange line to a different building on a customer's premises attract normal connection charges.

Rearrangements of Openreach Network Equipment and Line Plant Detail of rearrangement work of Openreach Network equipment and Line Plant (other than external shifts) can be found at:
http://www.openreach.co.uk/orpg/home/network/alteringournetwork/alteringournetwork.do


Notes:

For charging purposes part hours are rounded up to the next whole hour.

If the Openreach engineer is already visiting the premises to carry out other work only the hourly charge will apply.

If for operational reasons Openreach chooses to spread the job over several visits which in normal circumstances could have been carried out in a single visit, a single Standard Chargeable Visit charge will apply.  Otherwise a Standard Chargeable Visit will apply per engineer visit.

Charges for network infrastructure over and above standard requirements are charged as excess construction and can be found in `Excess Construction Charges' in the Service Products section of this Price List at :
http://www.openreach.co.uk/orpg/pricing/serviceproducts.do


   Back to top
British Telecommunications plc
Registered office:
81 Newgate Street
London EC1A 7AJ
Registered in England and Wales No. 1800000
www.openreach.co.uk